Implementation and Tuning of the Automatic Generation Control in the Energy National Control Center of Ecuador - CENACE
The Automatic Generation Control – AGC has as the main objective keep the system frequency and the net interchange in the tie lines near to their scheduled values through generation set points in the units conditioned to this purpose. Consequently, the AGC implementation requires a careful process o...
Saved in:
| Main Author: | |
|---|---|
| Format: | article |
| Language: | eng |
| Published: |
2007
|
| Subjects: | |
| Online Access: | http://bibdigital.epn.edu.ec/handle/15000/9319 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | The Automatic Generation Control – AGC has as the main objective keep the system frequency and the net interchange in the tie lines near to their scheduled values through generation set points in the units conditioned to this purpose. Consequently, the AGC implementation requires a careful process of tuning and testing of the remote control devices for generation units and the AGC program installed in the Electric Market Administrator. |
|---|