Propuesta para reducir la cartera vencida del sistema de riego Carrizal Chone del cantón Bolívar a partir de un estudio socioeconómico

The objective of this research was to design strategic actions to improve the recovery of past due portfolio in the Carrizal Chone Irrigation System of the Bolivar Canton by a socio-economic study, this institution has a 63% of past due portafolio averaging 680 people and whom do not have an appropr...

Cur síos iomlán

Sábháilte in:
Sonraí bibleagrafaíochta
Príomhchruthaitheoir: Sacón Moreira, Mónica Victoria (author)
Formáid: bachelorThesis
Teanga:spa
Foilsithe / Cruthaithe: 2013
Ábhair:
Rochtain ar líne:http://repositorio.espam.edu.ec/handle/42000/158
Clibeanna: Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
Cur síos
Achoimre:The objective of this research was to design strategic actions to improve the recovery of past due portfolio in the Carrizal Chone Irrigation System of the Bolivar Canton by a socio-economic study, this institution has a 63% of past due portafolio averaging 680 people and whom do not have an appropriate plan of revenue, for the analysis of the current situation of the institution was realized field visits, interviews with officials, plus SWOT matrix analysis to determine the internal and external situation of the problem of study, then a socioeconomic study on users who have payments delays, for which a survey detected the main reasons for the problem, then a chart of cause and effect, the results of the socioeconomic study for the strategic proposal was made to improve the recovery process consisting of necessary tools for the recovery of the portfolio, to strengthen the institution a socialization of the proposal was done.