Diseño de completación dual concéntrica bes- fn para casing de 9 5/8
The purpose for this project is to develop a dual concentric completion where we´re going to produce two stratus. The sand “U down” will produce using ESP due to the characteristics of the fluid and the production level. The sand “Upper Hollin” will be produced using Natural Flow because the reservo...
Saved in:
| Main Author: | Soto Almeida, Joao Carlos (author) |
|---|---|
| Other Authors: | Salazar Serrano, Carlos Patricio (author) |
| Format: | article |
| Language: | spa |
| Published: |
2009
|
| Subjects: | |
| Online Access: | http://www.dspace.espol.edu.ec/handle/123456789/8021 |
| Tags: |
No Tags, Be the first to tag this record!
|
Similar Items
-
Diseño de una completación dual concentrica bes-bes de un pozo en el oriente ecuatoriano revestido con un casing de 7 pulgadas
by: Villavicencio Chafla, Edgar
Published: (2009) -
Diseño de una Completación Dual Concéntrica BES-FIN con Casing de 9 5/8" en el Oriente Ecuatoriano
by: Soto Almeida, Joao Carlos
Published: (2009) -
“completación dual concéntrica con bomba electrosumergible y flujo natural de un pozo en el oriente ecuatoriano para revestimiento de 9-5/8” y liner de 7”
by: Peralta, Evelyn Cecilia
Published: (2011) -
“completación dual concéntrica con bombas eléctricas sumergibles de un pozo en el oriente ecuatoriano revestido con casing de 9-5/8”
by: Romero Pinargote, Cesar
Published: (2010) -
Comparación técnico-económica entre sistemas de completación inteligente y dual concéntrica para optimizar la producción del campo Lago Agrio
by: Borja Santamaria, Piedad Isabel
Published: (2017)