“completación dual concéntrica con bombas eléctricas sumergibles de un pozo en el oriente ecuatoriano revestido con casing de 9-5/8”
This paper aims to show the design of a dual completion concentric with electric submersible pumps, pipe coating with 9-5/8''to the well ESPOL CR-AG. Having as main objective the design of a completion, considering the production of the field, lining the hole, the arrangement of production...
-д хадгалсан:
| Үндсэн зохиолч: | Romero Pinargote, Cesar (author) |
|---|---|
| Бусад зохиолчид: | Gómez Palacios, Alberto Bolívar (author), Roman, Hector (author), Tapia, Daniel (author) |
| Формат: | article |
| Хэл сонгох: | spa |
| Хэвлэсэн: |
2010
|
| Нөхцлүүд: | |
| Онлайн хандалт: | http://www.dspace.espol.edu.ec/handle/123456789/13291 |
| Шошгууд: |
Шошго байхгүй, Энэхүү баримтыг шошголох эхний хүн болох!
|
Ижил төстэй зүйлс
Ижил төстэй зүйлс
-
“completación dual concéntrica con bomba electrosumergible y flujo natural de un pozo en el oriente ecuatoriano para revestimiento de 9-5/8” y liner de 7”
-н: Peralta, Evelyn Cecilia
Хэвлэсэн: (2011) -
Diseño de una completación dual concentrica bes-bes de un pozo en el oriente ecuatoriano revestido con un casing de 7 pulgadas
-н: Villavicencio Chafla, Edgar
Хэвлэсэн: (2009) -
Comparación técnico-económica entre sistemas de completación inteligente y dual concéntrica para optimizar la producción del campo Lago Agrio
-н: Borja Santamaria, Piedad Isabel
Хэвлэсэн: (2017) -
Implementación de completaciones duales con bombas electro sumergibles para los yacimientos del bloque 16 en el oriente ecuatoriano.
-н: Martínez Herrera, Alexis F.
Хэвлэсэн: (1997) -
Diseño de completación dual concéntrica bes- fn para casing de 9 5/8
-н: Soto Almeida, Joao Carlos
Хэвлэсэн: (2009)