Proyecto hidrologico río chimbo

Our country has had electric energy rationing problems, which owes to different factors; one of them is the high price of the energy, one of the highest of the region, product of the dependence on thermal generation. Another factor is the dependence on our biggest electrical generation project, Paut...

Full description

Saved in:
Bibliographic Details
Main Author: Orozco Coello, Danny (author)
Other Authors: Bermúdez, Gustavo (author)
Format: article
Language:spa
Published: 2010
Subjects:
Online Access:http://www.dspace.espol.edu.ec/handle/123456789/13383
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1858337213818863616
author Orozco Coello, Danny
author2 Bermúdez, Gustavo
author2_role author
author_facet Orozco Coello, Danny
Bermúdez, Gustavo
author_role author
collection Repositorio Escuela Superior Politécnica del Litoral
dc.creator.none.fl_str_mv Orozco Coello, Danny
Bermúdez, Gustavo
dc.date.none.fl_str_mv 2010-10-22
2010-10-22
2010-10-22
dc.format.none.fl_str_mv application/msword
dc.identifier.none.fl_str_mv http://www.dspace.espol.edu.ec/handle/123456789/13383
dc.language.none.fl_str_mv spa
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Escuela Superior Politécnica del Litoral
instname:Escuela Superior Politécnica del Litoral
instacron:ESPOL
dc.subject.none.fl_str_mv PROYECTO HIDROLÓGICO RIO CHIMBO
GENERACIÓN HIDROELÉCTRICA
RECURSO HÍDRICO
dc.title.none.fl_str_mv Proyecto hidrologico río chimbo
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/article
description Our country has had electric energy rationing problems, which owes to different factors; one of them is the high price of the energy, one of the highest of the region, product of the dependence on thermal generation. Another factor is the dependence on our biggest electrical generation project, Paute - Molino, which delivers a large percentage of the electric energy of our country. Despite this, in the drought months its installed capacity is missed because of the lack of water resource, it is then when energy rationing occurs. To face these problems it is necessary to boost hydroelectric projects of the basin of Guayas, which are capable of providing energy during these drought months and replacing thermoelectric energy during the rest of the year, obtaining with this to low the energy price. Particularly, this project analyzes the possibility of developing the hydroelectric plants one after another, in Chimbo River, denominated”River Chimbo Hydrologic Project”.
eu_rights_str_mv openAccess
format article
id ESPOL_c9bebdf987dd2d2f9c9fb5d041bd9459
instacron_str ESPOL
institution ESPOL
instname_str Escuela Superior Politécnica del Litoral
language spa
network_acronym_str ESPOL
network_name_str Repositorio Escuela Superior Politécnica del Litoral
oai_identifier_str oai:www.dspace.espol.edu.ec:123456789/13383
publishDate 2010
reponame_str Repositorio Escuela Superior Politécnica del Litoral
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Escuela Superior Politécnica del Litoral - Escuela Superior Politécnica del Litoral
repository_id_str 1479
spelling Proyecto hidrologico río chimboOrozco Coello, DannyBermúdez, GustavoPROYECTO HIDROLÓGICO RIO CHIMBOGENERACIÓN HIDROELÉCTRICARECURSO HÍDRICOOur country has had electric energy rationing problems, which owes to different factors; one of them is the high price of the energy, one of the highest of the region, product of the dependence on thermal generation. Another factor is the dependence on our biggest electrical generation project, Paute - Molino, which delivers a large percentage of the electric energy of our country. Despite this, in the drought months its installed capacity is missed because of the lack of water resource, it is then when energy rationing occurs. To face these problems it is necessary to boost hydroelectric projects of the basin of Guayas, which are capable of providing energy during these drought months and replacing thermoelectric energy during the rest of the year, obtaining with this to low the energy price. Particularly, this project analyzes the possibility of developing the hydroelectric plants one after another, in Chimbo River, denominated”River Chimbo Hydrologic Project”.2010-10-222010-10-222010-10-22info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/mswordhttp://www.dspace.espol.edu.ec/handle/123456789/13383spainfo:eu-repo/semantics/openAccessreponame:Repositorio Escuela Superior Politécnica del Litoralinstname:Escuela Superior Politécnica del Litoralinstacron:ESPOL2011-12-13T21:26:38Zoai:www.dspace.espol.edu.ec:123456789/13383Institucionalhttps://www.dspace.espol.edu.ec/Universidad públicahttps://www.espol.edu.ec/.https://www.dspace.espol.edu.ec/oaiEcuador...opendoar:14792011-12-13T21:26:38falseInstitucionalhttps://www.dspace.espol.edu.ec/Universidad públicahttps://www.espol.edu.ec/.https://www.dspace.espol.edu.ec/oai.Ecuador...opendoar:14792011-12-13T21:26:38Repositorio Escuela Superior Politécnica del Litoral - Escuela Superior Politécnica del Litoralfalse
spellingShingle Proyecto hidrologico río chimbo
Orozco Coello, Danny
PROYECTO HIDROLÓGICO RIO CHIMBO
GENERACIÓN HIDROELÉCTRICA
RECURSO HÍDRICO
status_str publishedVersion
title Proyecto hidrologico río chimbo
title_full Proyecto hidrologico río chimbo
title_fullStr Proyecto hidrologico río chimbo
title_full_unstemmed Proyecto hidrologico río chimbo
title_short Proyecto hidrologico río chimbo
title_sort Proyecto hidrologico río chimbo
topic PROYECTO HIDROLÓGICO RIO CHIMBO
GENERACIÓN HIDROELÉCTRICA
RECURSO HÍDRICO
url http://www.dspace.espol.edu.ec/handle/123456789/13383