Proyecto hidrologico río chimbo
Our country has had electric energy rationing problems, which owes to different factors; one of them is the high price of the energy, one of the highest of the region, product of the dependence on thermal generation. Another factor is the dependence on our biggest electrical generation project, Paut...
Saved in:
| Main Author: | Orozco Coello, Danny (author) |
|---|---|
| Other Authors: | Bermúdez, Gustavo (author) |
| Format: | article |
| Language: | spa |
| Published: |
2010
|
| Subjects: | |
| Online Access: | http://www.dspace.espol.edu.ec/handle/123456789/13383 |
| Tags: |
No Tags, Be the first to tag this record!
|
Similar Items
-
Proyecto hidrológico río chimbo
by: ESPOL. FIEC
Published: (2010) -
Aprovechamiento de las aguas del río luis para la producción de energía eléctrica
by: Luna Muñoz, Pablo
Published: (2009) -
Aprovechamiento de las aguas del río Cristal para la producción de energía eléctrica
by: Aguirre Mateus, Luis Javier
Published: (2008) -
Aprovechamiento de las aguas del río cristal para la producción de energía eléctrica
by: Aguirre Mateus, Luis Javier
Published: (2009) -
Análisis en cascada de los proyecto balsapamba alto, balsapamba medio y balsapamba bajo en el río cristal
by: Bosquez Sotomayor, Henry
Published: (2009)