Replanteo y trazado del proyecto vertical de la carretera: cerecita - tamarindo - bajada del progreso: tramo # 1 desde abs. 0+000 hasta abs. 1+100.

Completed the redesign of the project layout and horizontal, is theRethinking the vertical project, it serves to make the strip clearing with the relevant equipment, then placed side earth-moving spot, and left at subgrade elevation, both made it a good study done by for the movement of soil from th...