Replanteo y trazado del proyecto vertical de la carretera: cerecita - tamarindo - bajada del progreso: tramo # 1 desde abs. 0+000 hasta abs. 1+100.
Completed the redesign of the project layout and horizontal, is theRethinking the vertical project, it serves to make the strip clearing with the relevant equipment, then placed side earth-moving spot, and left at subgrade elevation, both made it a good study done by for the movement of soil from th...
Gorde:
| Egile nagusia: | Avilés De La Torre, Henry Wilson (author) |
|---|---|
| Beste egile batzuk: | Burgos Lazo, Alexis Benjamin (author), Maldonado Amaya, Miguel Emilio (author), Santos, Eduardo (author) |
| Formatua: | article |
| Hizkuntza: | spa |
| Argitaratua: |
2010
|
| Gaiak: | |
| Sarrera elektronikoa: | http://www.dspace.espol.edu.ec/handle/123456789/10163 |
| Etiketak: |
Etiketarik gabe, Izan zaitez lehena erregistro honi etiketa jartzen!
|
Antzeko izenburuak
-
Metodología para el Replanteo y Trazado del Proyecto Horizontal de la Vía: Tramos Cerecita – Tamarindo – La Bajada de Progreso
nork: Alcoser Serrano, Paco Junior
Argitaratua: (2009) -
Metodología para el replanteo y trazado del proyecto horizontal de la vía: tramos cerecita – tamarindo – la bajada de progreso
nork: Alcoser Serrano Paco, Paco Junior
Argitaratua: (2009) -
Replanteo y trazado del proyecto vertical de la carretera: Cerecita - Tamarindo - Bajada de Progreso: Tramo 1 desde Abs. 0+000 hasta Abs. 1+100
nork: Avilés De La Torre, Henry
Argitaratua: (2009) -
Trazado y Replanteo del Proyecto Horizontal de una Carretera Utilizando Estación Total. Caso Practico: Camino Vecinal la Chorrera
nork: Hurtares Orrala, Walter
Argitaratua: (2011) -
Replanteo e instalación de alcantarillas en una carretera
nork: Farías Meza, Juan A.
Argitaratua: (2009)