Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajo

In recent years the country has evolved in the electricity sector due to industrial growth which has resulted in increased demand for electricity and because our electricity sector is not in the ability to successfully meet this demand, we have seen in the need for new power sources. To help address...

Mô tả đầy đủ

Đã lưu trong:
Chi tiết về thư mục
Tác giả chính: Mosquera Bravo, Karla (author)
Tác giả khác: Valencia Burgos, Ángel (author), Oviedo Galarza, Jorge (author)
Định dạng: article
Ngôn ngữ:spa
Được phát hành: 2009
Những chủ đề:
Truy cập trực tuyến:http://www.dspace.espol.edu.ec/handle/123456789/7542
Các nhãn: Thêm thẻ
Không có thẻ, Là người đầu tiên thẻ bản ghi này!
_version_ 1858337407498190848
author Mosquera Bravo, Karla
author2 Valencia Burgos, Ángel
Oviedo Galarza, Jorge
author2_role author
author
author_facet Mosquera Bravo, Karla
Valencia Burgos, Ángel
Oviedo Galarza, Jorge
author_role author
collection Repositorio Escuela Superior Politécnica del Litoral
dc.creator.none.fl_str_mv Mosquera Bravo, Karla
Valencia Burgos, Ángel
Oviedo Galarza, Jorge
dc.date.none.fl_str_mv 2009-09-18
2009-09-18
2009-09-18
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv http://www.dspace.espol.edu.ec/handle/123456789/7542
dc.language.none.fl_str_mv spa
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Escuela Superior Politécnica del Litoral
instname:Escuela Superior Politécnica del Litoral
instacron:ESPOL
dc.subject.none.fl_str_mv OPTIMIZACIÓN
POTENCIA INSTALADA
CENTRAL HIDROELÉCTRICA
dc.title.none.fl_str_mv Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajo
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/article
description In recent years the country has evolved in the electricity sector due to industrial growth which has resulted in increased demand for electricity and because our electricity sector is not in the ability to successfully meet this demand, we have seen in the need for new power sources. To help address this problem we discuss the optimization of the hydroelectric project "Caluma Bajo" which is located in the “Guayas” river basin and sub-basin “Babahoyo” River system. The "Caluma Bajo" has a number of studies since the early INECEL Accomplish various hydrological and meteorological analysis led to the draft "Caluma Bajo" to a Prefactibilidad status, followed by the topic of past graduation and with the help of computer tools is left the project in the state that it is currently Factibilidad. Based on these studies and following the same methodology of work performed under INECEL and topical task forces of the past, the project "Caluma Bajo" is at a more advanced stage of development that is "Installed power optimization of the Central”.
eu_rights_str_mv openAccess
format article
id ESPOL_f8ea15ea79155ee5c365e40801ef162e
instacron_str ESPOL
institution ESPOL
instname_str Escuela Superior Politécnica del Litoral
language spa
network_acronym_str ESPOL
network_name_str Repositorio Escuela Superior Politécnica del Litoral
oai_identifier_str oai:www.dspace.espol.edu.ec:123456789/7542
publishDate 2009
reponame_str Repositorio Escuela Superior Politécnica del Litoral
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Escuela Superior Politécnica del Litoral - Escuela Superior Politécnica del Litoral
repository_id_str 1479
spelling Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajoMosquera Bravo, KarlaValencia Burgos, ÁngelOviedo Galarza, JorgeOPTIMIZACIÓNPOTENCIA INSTALADACENTRAL HIDROELÉCTRICAIn recent years the country has evolved in the electricity sector due to industrial growth which has resulted in increased demand for electricity and because our electricity sector is not in the ability to successfully meet this demand, we have seen in the need for new power sources. To help address this problem we discuss the optimization of the hydroelectric project "Caluma Bajo" which is located in the “Guayas” river basin and sub-basin “Babahoyo” River system. The "Caluma Bajo" has a number of studies since the early INECEL Accomplish various hydrological and meteorological analysis led to the draft "Caluma Bajo" to a Prefactibilidad status, followed by the topic of past graduation and with the help of computer tools is left the project in the state that it is currently Factibilidad. Based on these studies and following the same methodology of work performed under INECEL and topical task forces of the past, the project "Caluma Bajo" is at a more advanced stage of development that is "Installed power optimization of the Central”.2009-09-182009-09-182009-09-18info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttp://www.dspace.espol.edu.ec/handle/123456789/7542spainfo:eu-repo/semantics/openAccessreponame:Repositorio Escuela Superior Politécnica del Litoralinstname:Escuela Superior Politécnica del Litoralinstacron:ESPOL2018-04-04T17:59:44Zoai:www.dspace.espol.edu.ec:123456789/7542Institucionalhttps://www.dspace.espol.edu.ec/Universidad públicahttps://www.espol.edu.ec/.https://www.dspace.espol.edu.ec/oaiEcuador...opendoar:14792018-04-04T17:59:44falseInstitucionalhttps://www.dspace.espol.edu.ec/Universidad públicahttps://www.espol.edu.ec/.https://www.dspace.espol.edu.ec/oai.Ecuador...opendoar:14792018-04-04T17:59:44Repositorio Escuela Superior Politécnica del Litoral - Escuela Superior Politécnica del Litoralfalse
spellingShingle Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajo
Mosquera Bravo, Karla
OPTIMIZACIÓN
POTENCIA INSTALADA
CENTRAL HIDROELÉCTRICA
status_str publishedVersion
title Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajo
title_full Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajo
title_fullStr Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajo
title_full_unstemmed Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajo
title_short Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajo
title_sort Optimización de la potencia instalada del proyecto hidroeléctrica caluma bajo
topic OPTIMIZACIÓN
POTENCIA INSTALADA
CENTRAL HIDROELÉCTRICA
url http://www.dspace.espol.edu.ec/handle/123456789/7542