Propuesta de plan de gestión de costos y tiempo del proyecto rehabilitación vial Samborondón - Salitre aplicando Lean Construction
Road construction and maintenance are vital for development in Ecuador and globally, but they face challenges in planning, resulting in detrimental delays. These delays incur additional costs and economic losses. The Inter-American Development Bank reports that this issue affects around 40% of road...
Saved in:
| Hovedforfatter: | Gaon Espinoza, Jhonny Ismael (author) |
|---|---|
| Andre forfattere: | Mora Carmigniani, Edwin Jared (author) |
| Format: | bachelorThesis |
| Sprog: | spa |
| Udgivet: |
2024
|
| Fag: | |
| Online adgang: | http://repositorio.ulvr.edu.ec/handle/44000/7235 |
| Tags: |
Ingen Tags, Vær først til at tagge denne postø!
|
Lignende værker
-
Propuesta de plan de gestión de costos y tiempo del proyecto rehabilitación vial Samborondón - Salitre aplicando Lean Construction
af: Gaon Espinoza, Jhonny Ismael
Udgivet: (2024) -
Evaluación de seguridad vial en la Vía Cañar – Juncal - Zhud, aplicando la metodología iRAP
af: García Pazmiño, Patricio Misael
Udgivet: (2023) -
Evaluación de seguridad vial en la Vía Cañar – Juncal - Zhud, aplicando la metodología iRAP
af: García Pazmiño, Patricio Misael
Udgivet: (2023) -
El pavimento flexible y el método whitetopping en comparación al método tradicional para la rehabilitación de la vía principal del recinto Barranca de la ciudad de Samborondón
af: García Barzola, Arantxa Gabriela
Udgivet: (2022) -
El pavimento flexible y el método whitetopping en comparación al método tradicional para la rehabilitación de la vía principal del recinto Barranca de la ciudad de Samborondón
af: García Barzola, Arantxa Gabriela
Udgivet: (2022)