Propuesta de plan de gestión de costos y tiempo del proyecto rehabilitación vial Samborondón - Salitre aplicando Lean Construction
Road construction and maintenance are vital for development in Ecuador and globally, but they face challenges in planning, resulting in detrimental delays. These delays incur additional costs and economic losses. The Inter-American Development Bank reports that this issue affects around 40% of road...
Saved in:
| Main Author: | Gaon Espinoza, Jhonny Ismael (author) |
|---|---|
| Other Authors: | Mora Carmigniani, Edwin Jared (author) |
| Format: | bachelorThesis |
| Language: | spa |
| Published: |
2024
|
| Subjects: | |
| Online Access: | http://repositorio.ulvr.edu.ec/handle/44000/7235 |
| Tags: |
No Tags, Be the first to tag this record!
|
Similar Items
-
Propuesta de plan de gestión de costos y tiempo del proyecto rehabilitación vial Samborondón - Salitre aplicando Lean Construction
by: Gaon Espinoza, Jhonny Ismael
Published: (2024) -
Evaluación de seguridad vial en la Vía Cañar – Juncal - Zhud, aplicando la metodología iRAP
by: García Pazmiño, Patricio Misael
Published: (2023) -
Evaluación de seguridad vial en la Vía Cañar – Juncal - Zhud, aplicando la metodología iRAP
by: García Pazmiño, Patricio Misael
Published: (2023) -
El pavimento flexible y el método whitetopping en comparación al método tradicional para la rehabilitación de la vía principal del recinto Barranca de la ciudad de Samborondón
by: García Barzola, Arantxa Gabriela
Published: (2022) -
El pavimento flexible y el método whitetopping en comparación al método tradicional para la rehabilitación de la vía principal del recinto Barranca de la ciudad de Samborondón
by: García Barzola, Arantxa Gabriela
Published: (2022)