Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT)
The diagnosis of electrical installations included field visits, measurements of electrical parameters and power quality tests. Consequently, it was crucial to describe the current state of the company's electrical system in comparison with the current standards NTE INEN 2969 and ARCONEL, relat...
Shranjeno v:
| Glavni avtor: | |
|---|---|
| Drugi avtorji: | , , |
| Format: | article |
| Jezik: | spa |
| Izdano: |
2023
|
| Teme: | |
| Online dostop: | https://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/4222 |
| Oznake: |
Označite
Brez oznak, prvi označite!
|
| _version_ | 1859108848634167296 |
|---|---|
| author | Salazar Aviles, Damaris Eunice |
| author2 | Placencio Macías, Jean Paul Laverde Albarracín, Cristian Samuel Ortiz González, Yadyra Monserrath |
| author2_role | author author author |
| author_facet | Salazar Aviles, Damaris Eunice Placencio Macías, Jean Paul Laverde Albarracín, Cristian Samuel Ortiz González, Yadyra Monserrath |
| author_role | author |
| collection | Revista Ingenio |
| dc.creator.none.fl_str_mv | Salazar Aviles, Damaris Eunice Placencio Macías, Jean Paul Laverde Albarracín, Cristian Samuel Ortiz González, Yadyra Monserrath |
| dc.date.none.fl_str_mv | 2023-01-15 |
| dc.format.none.fl_str_mv | text/html text/html |
| dc.identifier.none.fl_str_mv | https://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/4222 10.29166/ingenio.v6i1.4222 |
| dc.language.none.fl_str_mv | spa |
| dc.publisher.none.fl_str_mv | Universidad Central del Ecuador |
| dc.relation.none.fl_str_mv | https://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/4222/5324 https://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/4222/5325 |
| dc.rights.none.fl_str_mv | http://creativecommons.org/licenses/by-nc-nd/4.0 info:eu-repo/semantics/openAccess |
| dc.source.none.fl_str_mv | INGENIO; Vol. 6 No. 1 (2023): Process Digitalization; 70-79 INGENIO; Vol. 6 Núm. 1 (2023): Digitalización de Procesos; 70-79 2697-3243 2588-0829 reponame:Revista Ingenio instname:Universidad Central del Ecuador instacron:UCE |
| dc.subject.none.fl_str_mv | Demanda potencia instalada calidad de energía Auditoría energética ahorro de energía demand instaled power energy audit energy savings |
| dc.title.none.fl_str_mv | Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT) Auditoría Energética en las Instalaciones del Centro de Operaciones y Mantenimiento de Transporte (COMT) |
| dc.type.none.fl_str_mv | info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
| description | The diagnosis of electrical installations included field visits, measurements of electrical parameters and power quality tests. Consequently, it was crucial to describe the current state of the company's electrical system in comparison with the current standards NTE INEN 2969 and ARCONEL, related to lighting levels and energy quality, respectively. Since the installed load is broken down by zones and the group that represents the highest energy consumption per month is identified, the selection of measures to improve energy efficiency is based on an examination of the existing situation. The investigation demonstrates and concludes that the request for a modification in the rate schedule would mean a substantial saving of $2,579,904 per year. |
| eu_rights_str_mv | openAccess |
| format | article |
| id | REVINGENIO_b3cf00019b2eec35ac7c85b8eaba045f |
| identifier_str_mv | 10.29166/ingenio.v6i1.4222 |
| instacron_str | UCE |
| institution | UCE |
| instname_str | Universidad Central del Ecuador |
| language | spa |
| network_acronym_str | REVINGENIO |
| network_name_str | Revista Ingenio |
| oai_identifier_str | oai:revistadigital.uce.edu.ec:article/4222 |
| publishDate | 2023 |
| publisher.none.fl_str_mv | Universidad Central del Ecuador |
| reponame_str | Revista Ingenio |
| repository.mail.fl_str_mv | * |
| repository.name.fl_str_mv | Revista Ingenio - Universidad Central del Ecuador |
| repository_id_str | 0 |
| rights_invalid_str_mv | http://creativecommons.org/licenses/by-nc-nd/4.0 |
| spelling | Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT)Auditoría Energética en las Instalaciones del Centro de Operaciones y Mantenimiento de Transporte (COMT)Salazar Aviles, Damaris EunicePlacencio Macías, Jean PaulLaverde Albarracín, Cristian SamuelOrtiz González, Yadyra MonserrathDemandapotencia instaladacalidad de energíaAuditoría energéticaahorro de energíademandinstaled powerenergy auditenergy savingsThe diagnosis of electrical installations included field visits, measurements of electrical parameters and power quality tests. Consequently, it was crucial to describe the current state of the company's electrical system in comparison with the current standards NTE INEN 2969 and ARCONEL, related to lighting levels and energy quality, respectively. Since the installed load is broken down by zones and the group that represents the highest energy consumption per month is identified, the selection of measures to improve energy efficiency is based on an examination of the existing situation. The investigation demonstrates and concludes that the request for a modification in the rate schedule would mean a substantial saving of $2,579,904 per year.El diagnóstico de las instalaciones eléctricas se realizó mediane visitas de campo, mediciones de parámetros eléctricos y pruebas de calidad de energía. Consecuentemente, fue crucial describir el estado actual del sistema eléctrico de la empresa en comparación con las normas vigentes NTE INEN 2969 y ARCONEL, relacionadas con los niveles de iluminación y calidad de la energía, respectivamente. Dado que la carga instalada se desglosa por zonas y se identifica el grupo que representa el mayor consumo de energía al mes, la selección de medidas para mejorar la eficiencia energética se basa en un examen de la situación existente. La investigación demuestra y llega a la conclusión de que la solicitud de una modificación en el esquema tarifario supondría un ahorro sustancial de $ 2579,904 anual. Universidad Central del Ecuador2023-01-15info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersiontext/htmltext/htmlhttps://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/422210.29166/ingenio.v6i1.4222INGENIO; Vol. 6 No. 1 (2023): Process Digitalization; 70-79INGENIO; Vol. 6 Núm. 1 (2023): Digitalización de Procesos; 70-792697-32432588-0829reponame:Revista Ingenioinstname:Universidad Central del Ecuadorinstacron:UCEspahttps://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/4222/5324https://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/4222/5325Derechos de autor 2023 Damaris Eunice Salazar Aviles, Jean Paul Placencio Macías, Cristian Samuel Laverde , Yadyra Monserrath Ortiz Gonzálezhttp://creativecommons.org/licenses/by-nc-nd/4.0info:eu-repo/semantics/openAccess2025-07-18T16:36:52Zoai:revistadigital.uce.edu.ec:article/4222Portal de revistashttps://revistadigital.uce.edu.ec/Universidad públicahttps://uce.edu.ec/**Ecuador*2697-32432588-0829opendoar:02025-07-18T16:36:52Revista Ingenio - Universidad Central del Ecuadorfalse |
| spellingShingle | Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT) Salazar Aviles, Damaris Eunice Demanda potencia instalada calidad de energía Auditoría energética ahorro de energía demand instaled power energy audit energy savings |
| status_str | publishedVersion |
| title | Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT) |
| title_full | Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT) |
| title_fullStr | Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT) |
| title_full_unstemmed | Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT) |
| title_short | Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT) |
| title_sort | Energy Audit in the Facilities of the Transport Operations and Maintenance Center (COMT) |
| topic | Demanda potencia instalada calidad de energía Auditoría energética ahorro de energía demand instaled power energy audit energy savings |
| url | https://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/4222 |