Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.

This study will be carried out in order that in the future the electric company CNEL Guayaquil Business Unit can provide an efficient distribution of medium voltage energy to road users to the coast, located northwest of the city of Guayaquil. By means of a statistical study, it is also intended to...

Szczegółowa specyfikacja

Zapisane w:
Opis bibliograficzny
1. autor: Díaz Jordán, Jefferson Ricardo (author)
Format: bachelorThesis
Język:spa
Wydane: 2019
Hasła przedmiotowe:
Dostęp online:http://repositorio.ucsg.edu.ec/handle/3317/12486
Etykiety: Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
_version_ 1858395216301522944
author Díaz Jordán, Jefferson Ricardo
author_facet Díaz Jordán, Jefferson Ricardo
author_role author
collection Repositorio Universidad Católica de Santiago de Guayaquil
dc.contributor.none.fl_str_mv Suárez Murillo, Efraín Oswaldo
dc.creator.none.fl_str_mv Díaz Jordán, Jefferson Ricardo
dc.date.none.fl_str_mv 2019-04-10T21:29:36Z
2019-04-10T21:29:36Z
2019-03-14
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv http://repositorio.ucsg.edu.ec/handle/3317/12486
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Universidad Católica de Santiago de Guayaquil
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
http://creativecommons.org/licenses/by-nc-sa/4.0/
dc.source.none.fl_str_mv reponame:Repositorio Universidad Católica de Santiago de Guayaquil
instname:Universidad Católica de Santiago de Guayaquil
instacron:UCSG
dc.subject.none.fl_str_mv OPERACIONES ALIMENTADORAS
SELECTIVIDAD
ENERGÍA
DISTRIBUCIÓN
LEY DE PARETO
FALLAS
RECONECTADORES
dc.title.none.fl_str_mv Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.
dc.type.none.fl_str_mv info:eu-repo/semantics/bachelorThesis
info:eu-repo/semantics/publishedVersion
description This study will be carried out in order that in the future the electric company CNEL Guayaquil Business Unit can provide an efficient distribution of medium voltage energy to road users to the coast, located northwest of the city of Guayaquil. By means of a statistical study, it is also intended to reduce the different types of failures that exist in feeder operations in previous years, trying to identify the critical points in order to determine the possible solutions. By creating surveys and statistical data it is possible to determine specific places through a Pareto Law table of 80-20%, which will help, to take solutions in strategic locations to obtain a more timely result. There are three substations in the path to the coast, in each substation there is an operator that determines by installed alarms any failure produced, the same ones that are reported to the SCADA Central, which generates actions to be executed and possible tests depending on type of localized fault of the place, to be able to install in strategic points recloses that are going to help to have an efficient quality of energy, where it is tried to reduce the time of response of attention for the repair and determination of failures, some of them in certain circumstances could be of complex solution, and in special cases can postpone days in the repair since there could be no availability of materials or climatic conditions that affect the distribution networks. With recloses it´s expected to solve drastic impacts in the distribution network, which affect the flow of energy to its destination. Selection of the reclose type will be determined based on the vacuum, quality, response time and security tests that will be provided when installing it.
eu_rights_str_mv openAccess
format bachelorThesis
id UCSG_76a4db0fc60cdcfb9a1650efe7f8b208
instacron_str UCSG
institution UCSG
instname_str Universidad Católica de Santiago de Guayaquil
language spa
network_acronym_str UCSG
network_name_str Repositorio Universidad Católica de Santiago de Guayaquil
oai_identifier_str oai:repositorio.ucsg.edu.ec:3317/12486
publishDate 2019
publisher.none.fl_str_mv Universidad Católica de Santiago de Guayaquil
reponame_str Repositorio Universidad Católica de Santiago de Guayaquil
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Católica de Santiago de Guayaquil - Universidad Católica de Santiago de Guayaquil
repository_id_str 2566
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/4.0/
spelling Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.Díaz Jordán, Jefferson RicardoOPERACIONES ALIMENTADORASSELECTIVIDADENERGÍADISTRIBUCIÓNLEY DE PARETOFALLASRECONECTADORESThis study will be carried out in order that in the future the electric company CNEL Guayaquil Business Unit can provide an efficient distribution of medium voltage energy to road users to the coast, located northwest of the city of Guayaquil. By means of a statistical study, it is also intended to reduce the different types of failures that exist in feeder operations in previous years, trying to identify the critical points in order to determine the possible solutions. By creating surveys and statistical data it is possible to determine specific places through a Pareto Law table of 80-20%, which will help, to take solutions in strategic locations to obtain a more timely result. There are three substations in the path to the coast, in each substation there is an operator that determines by installed alarms any failure produced, the same ones that are reported to the SCADA Central, which generates actions to be executed and possible tests depending on type of localized fault of the place, to be able to install in strategic points recloses that are going to help to have an efficient quality of energy, where it is tried to reduce the time of response of attention for the repair and determination of failures, some of them in certain circumstances could be of complex solution, and in special cases can postpone days in the repair since there could be no availability of materials or climatic conditions that affect the distribution networks. With recloses it´s expected to solve drastic impacts in the distribution network, which affect the flow of energy to its destination. Selection of the reclose type will be determined based on the vacuum, quality, response time and security tests that will be provided when installing it.El siguiente estudio se realizará con el fin de que a futuro la empresa eléctrica CNEL Unidad de Negocios Guayaquil pueda brindar una eficiente distribución de energía en media tensión a los usuarios de vía a la costa, ubicada al noroeste de la ciudad de Guayaquil. Mediante un estudio estadístico también se pretende reducir los diferentes tipos de fallas que existen por las operaciones de alimentadoras en años anteriores, tratando de identificar los puntos críticos para poder determinar las posibles soluciones. Creando encuestas y datos estadísticos es posible determinar lugares específicos mediante una tabla de la Ley de Pareto del 80-20 %, el cual va ayudar, a tomar soluciones en lugres estratégicos para obtener un resultado más puntual. En el trayecto de vía a la costa existen tres subestaciones, en cada sub estación hay un operador que determina mediante alarmas instaladas cualquier falla producida, las mismas que son reportadas a la Central de SCADA, la cual genera acciones a ejecutar y posibles pruebas dependiendo de tipo de falla localizada del lugar, para poder instalar en puntos estratégicos reconectadores que van a ayudar a tener una eficiente calidad de energía, en donde se pretende reducir el tiempo de repuesta de atención para la reparación y determinación de fallas, algunas de ellas en ciertas circunstancias podrían ser de compleja solución, y en casos especiales puede posponer días en la reparación ya que podría no existir disponibilidad de materiales o condiciones climáticas que afecten a las redes de distribución. Con reconectadores se espera solucionar impactos drásticos en la red de distribución, que afecten el flujo de energía a su destino. La selección del tipo de reconectador se determinará en base a las pruebas en vacío, calidad, tiempo de repuesta y seguridad que me proveerá al instalarlo.Universidad Católica de Santiago de GuayaquilSuárez Murillo, Efraín Oswaldo2019-04-10T21:29:36Z2019-04-10T21:29:36Z2019-03-14info:eu-repo/semantics/bachelorThesisinfo:eu-repo/semantics/publishedVersionapplication/pdfhttp://repositorio.ucsg.edu.ec/handle/3317/12486spainfo:eu-repo/semantics/openAccesshttp://creativecommons.org/licenses/by-nc-sa/4.0/reponame:Repositorio Universidad Católica de Santiago de Guayaquilinstname:Universidad Católica de Santiago de Guayaquilinstacron:UCSG2019-04-11T13:06:44Zoai:repositorio.ucsg.edu.ec:3317/12486Institucionalhttp://repositorio.ucsg.edu.ec/Universidad privadahttps://www.ucsg.edu.ec/http://repositorio.ucsg.edu.ec/oai.Ecuador...opendoar:25662026-02-28T18:17:21.640633Repositorio Universidad Católica de Santiago de Guayaquil - Universidad Católica de Santiago de Guayaquiltrue
spellingShingle Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.
Díaz Jordán, Jefferson Ricardo
OPERACIONES ALIMENTADORAS
SELECTIVIDAD
ENERGÍA
DISTRIBUCIÓN
LEY DE PARETO
FALLAS
RECONECTADORES
status_str publishedVersion
title Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.
title_full Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.
title_fullStr Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.
title_full_unstemmed Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.
title_short Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.
title_sort Estudio para la implementación de reconectadores mediante aplicación de la ley de Pareto para determinar el 20% de las causas que generan el 80% de las fallas en el servicio eléctrico desde el km 5 hasta el km 24 en vía a la costa en Guayaquil, en media tensión de las redes de distribución.
topic OPERACIONES ALIMENTADORAS
SELECTIVIDAD
ENERGÍA
DISTRIBUCIÓN
LEY DE PARETO
FALLAS
RECONECTADORES
url http://repositorio.ucsg.edu.ec/handle/3317/12486