Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction Planner
Збережено в:
| Автор: | |
|---|---|
| Формат: | bachelorThesis |
| Мова: | spa |
| Опубліковано: |
2024
|
| Предмети: | |
| Онлайн доступ: | https://repositorio.ug.edu.ec/handle/redug/77300 |
| Теги: |
Додати тег
Немає тегів, Будьте першим, хто поставить тег для цього запису!
|
| _version_ | 1862789185481474048 |
|---|---|
| author | Burgos Piza Juan Antonio |
| author_facet | Burgos Piza Juan Antonio |
| author_role | author |
| collection | Repositorio Universidad de Guayaquil |
| dc.contributor.none.fl_str_mv | Fun Sang Robinson Kerly Coralia |
| dc.creator.none.fl_str_mv | Burgos Piza Juan Antonio |
| dc.date.none.fl_str_mv | 2024-12-05T15:21:43Z 2024-12-05T15:21:43Z 2024-09 |
| dc.format.none.fl_str_mv | application/pdf |
| dc.identifier.none.fl_str_mv | APA https://repositorio.ug.edu.ec/handle/redug/77300 |
| dc.language.none.fl_str_mv | spa |
| dc.publisher.none.fl_str_mv | Universidad de Guayaquil - Facultad de Ciencias Matemáticas y Físicas - Carrera de Ingeniería Civil |
| dc.rights.none.fl_str_mv | info:eu-repo/semantics/openAccess |
| dc.source.none.fl_str_mv | reponame:Repositorio Universidad de Guayaquil instname:Universidad de Guayaquil instacron:UG |
| dc.subject.none.fl_str_mv | PLANIFICACIÓN CRONOGRAMA PRESUPUESTO OPTIMIZACIÓN RESULTADO |
| dc.title.none.fl_str_mv | Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction Planner |
| dc.type.none.fl_str_mv | info:eu-repo/semantics/bachelorThesis info:eu-repo/semantics/publishedVersion |
| description | pdf |
| eu_rights_str_mv | openAccess |
| format | bachelorThesis |
| id | UG_93fbd13be6e4bb1c4c8737b56c876df9 |
| identifier_str_mv | APA |
| instacron_str | UG |
| institution | UG |
| instname_str | Universidad de Guayaquil |
| language | spa |
| network_acronym_str | UG |
| network_name_str | Repositorio Universidad de Guayaquil |
| oai_identifier_str | oai:repositorio.ug.edu.ec:redug/77300 |
| publishDate | 2024 |
| publisher.none.fl_str_mv | Universidad de Guayaquil - Facultad de Ciencias Matemáticas y Físicas - Carrera de Ingeniería Civil |
| reponame_str | Repositorio Universidad de Guayaquil |
| repository.mail.fl_str_mv | . |
| repository.name.fl_str_mv | Repositorio Universidad de Guayaquil - Universidad de Guayaquil |
| repository_id_str | 0 |
| spelling | Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction PlannerBurgos Piza Juan AntonioPLANIFICACIÓNCRONOGRAMAPRESUPUESTOOPTIMIZACIÓNRESULTADOpdfSe planteó la planificación de obra para la construcción de la segunda fase de rehabilitación del Terminal Terrestre Máster José Francisco León Veas, ubicado en Vinces Provincia de los Ríos, aplicando la Metodología Lean Construction Planner. Para la elaboración del presupuesto se obtuvo los datos del Servicio Nacional de Contratación Pública (SERCOP), para hacer un análisis completo y una comparación entre la Metodología Lean Construction y la Metodología Tradicional fue necesario hacer uso de la herramienta Microsoft Excel en el que se elaboró los análisis de precios unitarios y el cronograma valorado. Se aplicó el método de la sectorización, que nos brinda la Metodología Lean Construction, en la que se hizo uso de la herramienta Microsoft Project Professional para la elaboración del cronograma de ejecución de la obra, optimizar el tiempo de ejecución y el costo del proyecto.Work planning was proposed for the construction of the second phase of rehabilitation of the Master Jose Francisco Leon Veas land terminal, located in Vinces Province of Los Ríos, applying the Lean Construction Planner Methodology. To prepare the budget, data was obtained from the National Public Procurement Service (SERCOP), to make a complete analysis and comparison with the lean construction method and the traditional method, it was necessary to use the Microsoft Excel tool in which it was prepared. unit price analysis and valued schedule. The sectorization method was applied, which provides us with the Lean Construction Methodology, in which the Microsoft Project Professional tool was used to prepare the execution schedule of the work, optimize the execution time and the cost of the project.Universidad de Guayaquil - Facultad de Ciencias Matemáticas y Físicas - Carrera de Ingeniería CivilFun Sang Robinson Kerly Coralia2024-12-05T15:21:43Z2024-12-05T15:21:43Z2024-09info:eu-repo/semantics/bachelorThesisinfo:eu-repo/semantics/publishedVersionapplication/pdfAPAhttps://repositorio.ug.edu.ec/handle/redug/77300spainfo:eu-repo/semantics/openAccessreponame:Repositorio Universidad de Guayaquilinstname:Universidad de Guayaquilinstacron:UG2024-12-09T03:05:33Zoai:repositorio.ug.edu.ec:redug/77300Institucionalhttp://repositorio.ug.edu.ec/Universidad públicahttps://www.ug.edu.ec/..Ecuador...opendoar:02026-04-18T05:46:19.152304Repositorio Universidad de Guayaquil - Universidad de Guayaquiltrue |
| spellingShingle | Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction Planner Burgos Piza Juan Antonio PLANIFICACIÓN CRONOGRAMA PRESUPUESTO OPTIMIZACIÓN RESULTADO |
| status_str | publishedVersion |
| title | Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction Planner |
| title_full | Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction Planner |
| title_fullStr | Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction Planner |
| title_full_unstemmed | Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction Planner |
| title_short | Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction Planner |
| title_sort | Planificación para la Segunda Fase de Rehabilitación del Terminal Terrestre Máster José Francisco León Veas de Vinces, Provincia los Ríos; Aplicando la Metodología Lean Construction Planner |
| topic | PLANIFICACIÓN CRONOGRAMA PRESUPUESTO OPTIMIZACIÓN RESULTADO |
| url | https://repositorio.ug.edu.ec/handle/redug/77300 |