Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.

Este documento contiene archivo en PDF.

Saved in:
Bibliographic Details
Main Author: Jiménez Zambrano, Pablo Edgar (author)
Format: bachelorThesis
Language:spa
Published: 2017
Subjects:
Online Access:http://repositorio.ug.edu.ec/handle/redug/24496
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1858988022418112512
author Jiménez Zambrano, Pablo Edgar
author_facet Jiménez Zambrano, Pablo Edgar
author_role author
collection Repositorio Universidad de Guayaquil
dc.contributor.none.fl_str_mv Hurtado Paspuel, Jimmy Fernando
dc.creator.none.fl_str_mv Jiménez Zambrano, Pablo Edgar
dc.date.none.fl_str_mv 2017-12-06
2018-01-18T13:44:40Z
2018-01-18T13:44:40Z
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv http://repositorio.ug.edu.ec/handle/redug/24496
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Universidad de Guayaquil. Facultad de Ingeniería Industrial. Carrera de Ingeniería Industrial.
dc.relation.none.fl_str_mv ;BINGI04999
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad de Guayaquil
instname:Universidad de Guayaquil
instacron:UG
dc.subject.none.fl_str_mv SISTEMAS PRODUCTIVOS
PLAN DE MANTENIMIENTO
CONFIABILIDAD RCM
REDUCCIÓN DE AVERÍAS EN MÁQUINAS
dc.title.none.fl_str_mv Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description Este documento contiene archivo en PDF.
eu_rights_str_mv openAccess
format bachelorThesis
id UG_dccddcf2723f1105b3dc9d3c616d9783
instacron_str UG
institution UG
instname_str Universidad de Guayaquil
language spa
network_acronym_str UG
network_name_str Repositorio Universidad de Guayaquil
oai_identifier_str oai:repositorio.ug.edu.ec:redug/24496
publishDate 2017
publisher.none.fl_str_mv Universidad de Guayaquil. Facultad de Ingeniería Industrial. Carrera de Ingeniería Industrial.
reponame_str Repositorio Universidad de Guayaquil
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad de Guayaquil - Universidad de Guayaquil
repository_id_str 0
spelling Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.Jiménez Zambrano, Pablo EdgarSISTEMAS PRODUCTIVOSPLAN DE MANTENIMIENTOCONFIABILIDAD RCMREDUCCIÓN DE AVERÍAS EN MÁQUINASEste documento contiene archivo en PDF.El presente proyecto muestra una propuesta de mejora que se basa en la elaboración de un plan de mantenimiento centrado en la confiabilidad RCM mantenimiento de cuarta generación, que es una de las técnicas organizativas aplicadas actualmente al cuidado de maquinarias, equipos, componentes y sistemas de las maquina mejorando significativamente los resultados, aplicado esto en el área de bunchado de la empresa Electrocables en la ciudad de Guayaquil, con el objetivo de reducir el número de averías, horas de averías, tiempo medio entre fallos MTBF y tiempo medio entre reparación de fallos MTTR. Se establece el análisis de modo de fallas y efectos AMFE lo cual ayuda a estudiar los mismos, también se realizar el análisis de modo de fallos, efectos y criticidad AMFEC a cada uno de los sistemas de las maquinas del área de bunchado, para reconocer los modos de fallas, efectos y criticidad, respecto al impacto operacional, frecuencia, mantenibilidad y detección que se consideran para impedir el incremento del índice de criticidad de máquinas, equipos, componentes y sistemas de la maquina. En el estudio económico de los problemas de la gestión del mantenimiento se establecen los costos por parada programada y no programada más el activo circulante no generado por los tiempos improductivos, el valor de estas dos últimas variables de análisis es de $ 19.680,70. Con la adaptación de la propuesta RCM se obtuvo un costo total de mantenimiento de $ 11.700,00 que representa un flujo de caja para el primer periodo por un valor de $ 5.172,28 y para el segundo periodo se presenta un incremento por un valor de $1.188,15, lo cual demuestra la importancia de la aplicación del presente trabajo de investigación. Con la metodología RCM se incrementa el tiempo medio entre fallos MTBF de 8.8 horas a 29.3 horas, también muestra un aumento de tiempo medio de reparación MTTR de 2.8 horas a 6.8 horas. Para la aplicación y continuidad del RCM se recomienda implementar capacitaciones con los siguientes temas: Mantenimiento basado en la confiabilidad RCM, Análisis de modos de fallas, efectos y criticidad AMFEC, Mantenimiento programado y autónomo, Metodología de las 5 S, Norma PAS 55.This project shows a proposal for improvement that is based on the elaboration of a plan of reliability centered maintenance RCM maintenance of fourth generation, which is one of the organizational techniques currently applied to the care of machinery, equipment, components and systems of the machine significantly improving results, applied this in the area of the company bunchado ELECTROCABLES in the city of Guayaquil, with the goal of reducing the number of malfunctions, hours of troubleshooting, meantime between failure MTBF and Mean time between repair of faults MTTR. Sets the analysis failure mode and effects analysis FMEA which helps to study the same, also carry out the analysis of failure mode, effects and criticality AMFEC to each one of the systems of the machines in the area of bunchado, to recognize the failure modes, effects and criticality, with respect to the operational impact, frequency, maintainability and detection that are considered to prevent the increase in the rate of criticality of machines, equipment, components and systems of the machine. In the economic study of the issues in the management of the maintenance costs for scheduled and unscheduled stop more assets not generated by downtime, the value of these two variables of analysis is $19.680,70. With the adaptation of the proposal RCM was obtained a total cost of maintenance of $ 11.700,00 that represents a cash flow for the first period with a value of $5.172,28 and for the second period is increased by a value of $1.188,15, which demonstrates the importance of the application of this research work. With the RCM methodology increases the mean time between failures MTBF of 8.8 hours to 29.3 hours, also shows an increase in mean time to repair MTTR from 2.8 hours to 6.8 hours. For the implementation and continuity of the RCM is recommended to implement training sessions with the following themes: the reliability Based Maintenance RCM, analysis of failure modes, effects and criticality AMFEC, scheduled maintenance and autonomous, Methodology of the 5 S, standard PAS 55.Universidad de Guayaquil. Facultad de Ingeniería Industrial. Carrera de Ingeniería Industrial.Hurtado Paspuel, Jimmy Fernando2018-01-18T13:44:40Z2018-01-18T13:44:40Z2017-12-06info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesisapplication/pdfhttp://repositorio.ug.edu.ec/handle/redug/24496spa;BINGI04999info:eu-repo/semantics/openAccessreponame:Repositorio Universidad de Guayaquilinstname:Universidad de Guayaquilinstacron:UG2018-01-30T16:25:55Zoai:repositorio.ug.edu.ec:redug/24496Institucionalhttp://repositorio.ug.edu.ec/Universidad públicahttps://www.ug.edu.ec/..Ecuador...opendoar:02026-03-07T07:00:46.774105Repositorio Universidad de Guayaquil - Universidad de Guayaquiltrue
spellingShingle Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.
Jiménez Zambrano, Pablo Edgar
SISTEMAS PRODUCTIVOS
PLAN DE MANTENIMIENTO
CONFIABILIDAD RCM
REDUCCIÓN DE AVERÍAS EN MÁQUINAS
status_str publishedVersion
title Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.
title_full Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.
title_fullStr Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.
title_full_unstemmed Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.
title_short Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.
title_sort Elaboración de un plan de mantenimiento centrado en la confiabilidad (RCM) para el área de bunchado en planta Electrocables de la ciudad de Guayaquil.
topic SISTEMAS PRODUCTIVOS
PLAN DE MANTENIMIENTO
CONFIABILIDAD RCM
REDUCCIÓN DE AVERÍAS EN MÁQUINAS
url http://repositorio.ug.edu.ec/handle/redug/24496