Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obras

In the Ecuador legislation requires that prior to the investment of public funds in infrastructure, is required the existence of a project which envisages in its life cycle phases of pre investment and investment, i.e., studies, and execution. A point have two phases mentioned in common is the budge...

Full description

Saved in:
Bibliographic Details
Main Author: Jaramillo S., Wilson E. (author)
Other Authors: Jácome G., Luis R. (author)
Format: article
Published: 2018
Subjects:
Online Access:https://doi.org/10.33890/innova.v3.n1.2018.313
https://repositorio.uide.edu.ec/handle/37000/3214
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1863446630722699264
author Jaramillo S., Wilson E.
author2 Jácome G., Luis R.
author2_role author
author_facet Jaramillo S., Wilson E.
Jácome G., Luis R.
author_role author
collection Repositorio Universidad Internacional del Ecuador
dc.creator.none.fl_str_mv Jaramillo S., Wilson E.
Jácome G., Luis R.
dc.date.none.fl_str_mv 2018-01-30
2019-05-02T16:35:40Z
2019-05-02T16:35:40Z
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv Jaramillo Sangurima, W. E., & Jacome Galarza, L. R. (2018). Método “investigación – acción” aplicado al desarrollo de software de presupuestos y programación de obras. INNOVA Research Journal, 3(1), 1-9. https://doi.org/10.33890/innova.v3.n1.2018.313
https://doi.org/10.33890/innova.v3.n1.2018.313
https://repositorio.uide.edu.ec/handle/37000/3214
dc.language.none.fl_str_mv es
dc.publisher.none.fl_str_mv INNOVA
dc.relation.none.fl_str_mv ISSN;2477-9024
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Internacional del Ecuador
instname:Universidad Internacional del Ecuador
instacron:UIDE
dc.subject.none.fl_str_mv presupuestos; programación de obras; construcción; diseño; investigación -acción
budgets; programming works; building; design; research-action
dc.title.none.fl_str_mv Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obras
Research -action" method applied to software development of budgets and works programming
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/article
description In the Ecuador legislation requires that prior to the investment of public funds in infrastructure, is required the existence of a project which envisages in its life cycle phases of pre investment and investment, i.e., studies, and execution. A point have two phases mentioned in common is the budget and the schedule of work, and the necessity ofa computer tool to strengthen and support in the elaboration of this task, the objective of research was to develop a computer easy to use to streng then system professionals in the design and construction of civil works in the preparation of budgets and programming based on current legislation. The research method used was considered a qualitative research approach and a research design called according to Hernandez (2010) as research -action, whose model consists of a set of decisions in spiral, which are based on repeated cycles of analysis to conceptualize and redefine the problem over and over again, integrating the work with the following sequential phases of action : planning, identification of facts, analysis, deployment (software development and immersion in the field) and evaluation.As a result of the work was obtained a computer system adapted to the tastes and requirements of engineers, architects and other professionals dedicated to the design and construction of civil works, which was so called "Works", demonstrating the effectiveness of action research method to improve concrete practices, as in this case particularly in budgeting and programming of civil works.
eu_rights_str_mv openAccess
format article
id UIDE_4dec63b1861ed2d7dd626bb4084a0dc5
identifier_str_mv Jaramillo Sangurima, W. E., & Jacome Galarza, L. R. (2018). Método “investigación – acción” aplicado al desarrollo de software de presupuestos y programación de obras. INNOVA Research Journal, 3(1), 1-9. https://doi.org/10.33890/innova.v3.n1.2018.313
instacron_str UIDE
institution UIDE
instname_str Universidad Internacional del Ecuador
language_invalid_str_mv es
network_acronym_str UIDE
network_name_str Repositorio Universidad Internacional del Ecuador
oai_identifier_str oai:repositorio.uide.edu.ec:37000/3214
publishDate 2018
publisher.none.fl_str_mv INNOVA
reponame_str Repositorio Universidad Internacional del Ecuador
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Internacional del Ecuador - Universidad Internacional del Ecuador
repository_id_str 6315
spelling Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obrasResearch -action" method applied to software development of budgets and works programmingJaramillo S., Wilson E.Jácome G., Luis R.presupuestos; programación de obras; construcción; diseño; investigación -acciónbudgets; programming works; building; design; research-actionIn the Ecuador legislation requires that prior to the investment of public funds in infrastructure, is required the existence of a project which envisages in its life cycle phases of pre investment and investment, i.e., studies, and execution. A point have two phases mentioned in common is the budget and the schedule of work, and the necessity ofa computer tool to strengthen and support in the elaboration of this task, the objective of research was to develop a computer easy to use to streng then system professionals in the design and construction of civil works in the preparation of budgets and programming based on current legislation. The research method used was considered a qualitative research approach and a research design called according to Hernandez (2010) as research -action, whose model consists of a set of decisions in spiral, which are based on repeated cycles of analysis to conceptualize and redefine the problem over and over again, integrating the work with the following sequential phases of action : planning, identification of facts, analysis, deployment (software development and immersion in the field) and evaluation.As a result of the work was obtained a computer system adapted to the tastes and requirements of engineers, architects and other professionals dedicated to the design and construction of civil works, which was so called "Works", demonstrating the effectiveness of action research method to improve concrete practices, as in this case particularly in budgeting and programming of civil works.En el Ecuador la legislación vigente exige que previo a la inversión de fondos públicos en obras de infraestructura, es requisito indispensable la existencia de un proyecto que contemple en su ciclo de vida las fases de pre inversión e inversión, es decir, estudios y ejecución. Un punto en común que tienen las dos fases mencionadas es el presupuesto y la programación de la obra, y dada la necesidad de una herramienta informática que fortalezca y apoye en la elaboración de esta tarea, el objetivo de investigación fue desarrollar en base a la normativa legal vigente un sistema informático de fácil utilización que fortalezca a los profesionales del diseño y construcción de obras civiles en la elaboración de presupuestos y programación.El método de investigación empleado consideró un enfoque de investigación cualitativo y un diseño de investigación denominado según Hernández (2010) como investigación –acción, cuyo modelo consiste en un conjunto de decisiones en espiral, las cuales se basan en ciclos repetidos de análisis para conceptualizar y redefinir el problema una y otra vez, integrando el trabajo con las siguientes fases secuenciales de acción: planificación, identificación de hechos, análisis, implementación (Desarrollo de software e inmersión en el campo) y evaluación. Como resultado del trabajo se obtuvo un sistema informáticoadaptado a los gustos y requerimientos de ingenieros, arquitectos y otros profesionales dedicados al diseño y construcción de obras civiles,al cual se lo denominó “Obras”, evidenciándose la efectividad del método denominado investigación–acción para mejorar prácticas concretas, como en este caso particular, en la elaboración de presupuestos y programación de obras civiles.INNOVA2019-05-02T16:35:40Z2019-05-02T16:35:40Z2018-01-30info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfJaramillo Sangurima, W. E., & Jacome Galarza, L. R. (2018). Método “investigación – acción” aplicado al desarrollo de software de presupuestos y programación de obras. INNOVA Research Journal, 3(1), 1-9. https://doi.org/10.33890/innova.v3.n1.2018.313https://doi.org/10.33890/innova.v3.n1.2018.313https://repositorio.uide.edu.ec/handle/37000/3214esISSN;2477-9024info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Internacional del Ecuadorinstname:Universidad Internacional del Ecuadorinstacron:UIDE2019-06-06T21:38:03Zoai:repositorio.uide.edu.ec:37000/3214Institucionalhttps://repositorio.uide.edu.ec/Institución privadahttps://www.uide.edu.ec/https://repositorio.uide.edu.ec/oaiEcuador...opendoar:63152026-04-25T11:41:45.019327trueInstitucionalhttps://repositorio.uide.edu.ec/Institución privadahttps://www.uide.edu.ec/https://repositorio.uide.edu.ec/oai.Ecuador...opendoar:63152026-04-25T11:41:45.019327Repositorio Universidad Internacional del Ecuador - Universidad Internacional del Ecuadortrue
spellingShingle Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obras
Jaramillo S., Wilson E.
presupuestos; programación de obras; construcción; diseño; investigación -acción
budgets; programming works; building; design; research-action
status_str publishedVersion
title Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obras
title_full Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obras
title_fullStr Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obras
title_full_unstemmed Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obras
title_short Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obras
title_sort Método “investigación –acción” aplicado al desarrollo de software de presupuestos y programación de obras
topic presupuestos; programación de obras; construcción; diseño; investigación -acción
budgets; programming works; building; design; research-action
url https://doi.org/10.33890/innova.v3.n1.2018.313
https://repositorio.uide.edu.ec/handle/37000/3214