Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura

The research focused on evaluating the application of the Lean Construction methodology in the planning of an infrastructure project, comparing it with the traditional critical path method. The main objective was to analyze the costs and times in the planning of a health infrastructure project, seek...

Fuld beskrivelse

Saved in:
Bibliografiske detaljer
Hovedforfatter: Arroyo Orozco, Jorge José (author)
Format: masterThesis
Sprog:spa
Udgivet: 2024
Fag:
Online adgang:http://repositorio.ulvr.edu.ec/handle/44000/7720
Tags: Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!
_version_ 1854619555634085888
author Arroyo Orozco, Jorge José
author_facet Arroyo Orozco, Jorge José
author_role author
collection Repositorio Universidad Laica Vicente Rocafuerte
dc.contributor.none.fl_str_mv Torres Rodríguez, Miguel Alberto
dc.creator.none.fl_str_mv Arroyo Orozco, Jorge José
dc.date.none.fl_str_mv 2024-12-16T16:32:47Z
2024-12-16T16:32:47Z
2024
dc.format.none.fl_str_mv 120 p.
dc.identifier.none.fl_str_mv Arroyo Orozco, Jorge José (2024). Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura. Guayaquil. ULVR. Posgrado / Maestría en Ingeniería Civil Mención Gestión de la Construcción / Tesis Maestría en Ingeniería Civil Mención Gestión de la Construcción. 120 p.
ULVR-BG/DI-TM-020/ARRe
http://repositorio.ulvr.edu.ec/handle/44000/7720
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Guayaquil: ULVR, 2024.
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Laica Vicente Rocafuerte
instname:Universidad Laica Vicente Rocafuerte
instacron:ULVR
dc.subject.none.fl_str_mv Planificación
Tiempo
Ingeniería de la construcción
Metodología
dc.title.none.fl_str_mv Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/masterThesis
description The research focused on evaluating the application of the Lean Construction methodology in the planning of an infrastructure project, comparing it with the traditional critical path method. The main objective was to analyze the costs and times in the planning of a health infrastructure project, seeking improvements in efficiency and results. The results of the application of the Lean Construction methodology in a sanitary sewer project demonstrated a significant savings of $167,463.82, which represents a reduction of 3.28% in the planned bid budget based on the critical path method. It was also possible to increase indirect costs from 19% to 24% since the profit increased by 5%, which resulted in an improved final cost of 8.28%. This savings is notable in projects of this nature. In terms of time, the methodology helped maintain precise control over the progress of the project, evidenced by the accumulated executed progress curve, which remained above the programmed curve, demonstrating that there were no delays in the project until closure. of this research. In addition, a reduction of one month is expected in the total time of the project, equivalent to 4.16% of the period initially offered. These results demonstrate the effectiveness of Lean Construction in optimizing costs and times in a healthcare infrastructure project. The methodology not only allowed significant reductions in the budget, but also guaranteed effective control of project progress, resulting in compliance with planned amounts, in shorter deadlines and greater efficiency in execution.
eu_rights_str_mv openAccess
format masterThesis
id ULVR_ae5da0e591431e24b3d5e241df1b2ee4
identifier_str_mv Arroyo Orozco, Jorge José (2024). Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura. Guayaquil. ULVR. Posgrado / Maestría en Ingeniería Civil Mención Gestión de la Construcción / Tesis Maestría en Ingeniería Civil Mención Gestión de la Construcción. 120 p.
ULVR-BG/DI-TM-020/ARRe
instacron_str ULVR
institution ULVR
instname_str Universidad Laica Vicente Rocafuerte
language spa
network_acronym_str ULVR
network_name_str Repositorio Universidad Laica Vicente Rocafuerte
oai_identifier_str oai:localhost:44000/7720
publishDate 2024
publisher.none.fl_str_mv Guayaquil: ULVR, 2024.
reponame_str Repositorio Universidad Laica Vicente Rocafuerte
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Laica Vicente Rocafuerte - Universidad Laica Vicente Rocafuerte
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructuraArroyo Orozco, Jorge JoséPlanificaciónTiempoIngeniería de la construcciónMetodologíaThe research focused on evaluating the application of the Lean Construction methodology in the planning of an infrastructure project, comparing it with the traditional critical path method. The main objective was to analyze the costs and times in the planning of a health infrastructure project, seeking improvements in efficiency and results. The results of the application of the Lean Construction methodology in a sanitary sewer project demonstrated a significant savings of $167,463.82, which represents a reduction of 3.28% in the planned bid budget based on the critical path method. It was also possible to increase indirect costs from 19% to 24% since the profit increased by 5%, which resulted in an improved final cost of 8.28%. This savings is notable in projects of this nature. In terms of time, the methodology helped maintain precise control over the progress of the project, evidenced by the accumulated executed progress curve, which remained above the programmed curve, demonstrating that there were no delays in the project until closure. of this research. In addition, a reduction of one month is expected in the total time of the project, equivalent to 4.16% of the period initially offered. These results demonstrate the effectiveness of Lean Construction in optimizing costs and times in a healthcare infrastructure project. The methodology not only allowed significant reductions in the budget, but also guaranteed effective control of project progress, resulting in compliance with planned amounts, in shorter deadlines and greater efficiency in execution.La investigación se centró en evaluar la aplicación de la metodología Lean Construction en la planificación de un proyecto de infraestructura, comparándola con el método tradicional de ruta crítica. El objetivo principal fue analizar los costos y tiempos en la planificación de un proyecto de infraestructura sanitaria, buscando mejoras en eficiencia y resultados. Los resultados de la aplicación de la metodología Lean Construction en un proyecto de alcantarillado sanitario demostraron un ahorro significativo de $167,463.82, lo que representa una reducción del 3.28% en el presupuesto de la oferta planificada en base del método de ruta crítica. También se logró incrementar los costos indirectos del 19% al 24% puesto que la utilidad aumentó en un 5%, lo que resultó en un costo final mejorado del 8.28%. Este ahorro es notable en proyectos de esta naturaleza. En términos de tiempo, la metodología ayudó a mantener un control preciso sobre el avance del proyecto, evidenciado por la curva de avance ejecutado acumulado, que se mantuvo por encima de la curva programada, demostrando que no se presentaron atrasos en el proyecto hasta el cierre de esta investigación. Además, se prevé una reducción de un mes en el tiempo total del proyecto, equivalente al 4.16% del plazo inicialmente ofertado. Estos resultados demuestran la eficacia de Lean Construction en la optimización de costos y tiempos en un proyecto de infraestructura sanitaria. La metodología no solo permitió reducciones significativas en el presupuesto, sino que también garantizó un control efectivo del progreso del proyecto, lo que resultó en el cumplimiento de los montos planificados, en plazos más cortos y una mayor eficiencia en la ejecución.Guayaquil: ULVR, 2024.Torres Rodríguez, Miguel Alberto2024-12-16T16:32:47Z2024-12-16T16:32:47Z2024info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis120 p.Arroyo Orozco, Jorge José (2024). Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura. Guayaquil. ULVR. Posgrado / Maestría en Ingeniería Civil Mención Gestión de la Construcción / Tesis Maestría en Ingeniería Civil Mención Gestión de la Construcción. 120 p.ULVR-BG/DI-TM-020/ARRehttp://repositorio.ulvr.edu.ec/handle/44000/7720spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Laica Vicente Rocafuerteinstname:Universidad Laica Vicente Rocafuerteinstacron:ULVR2024-12-17T08:04:36Zoai:localhost:44000/7720Institucionalhttp://repositorio.ulvr.edu.ec/Universidad privadahttps://www.ulvr.edu.ec/http://repositorio.ulvr.edu.ec/oai.Ecuador...opendoar:02026-01-18T02:18:06.580592Repositorio Universidad Laica Vicente Rocafuerte - Universidad Laica Vicente Rocafuertetrue
spellingShingle Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura
Arroyo Orozco, Jorge José
Planificación
Tiempo
Ingeniería de la construcción
Metodología
status_str publishedVersion
title Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura
title_full Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura
title_fullStr Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura
title_full_unstemmed Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura
title_short Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura
title_sort Evaluación de la aplicación de la metodología Lean construction en la planificación de un proyecto de infraestructura
topic Planificación
Tiempo
Ingeniería de la construcción
Metodología
url http://repositorio.ulvr.edu.ec/handle/44000/7720