Análisis de rendimientos y diseño de un modelo de cálculo para el control de la maquinaria y mano de obra en proyectos de vías
It is not always possible to predict all the factors involved in the implementation of a project, but it is possible to approach to it so that there is no variation between what was planned and what was really carried out, since we can overestimate or underestimate the cost of the construction.
Saved in:
| Hovedforfatter: | Barragán Herrera, Nelson Bolivar (author) |
|---|---|
| Andre forfattere: | Román Merino, Ruth Alicia (author) |
| Format: | bachelorThesis |
| Sprog: | spa |
| Udgivet: |
2015
|
| Fag: | |
| Online adgang: | http://dspace.unach.edu.ec/handle/51000/573 |
| Tags: |
Ingen Tags, Vær først til at tagge denne postø!
|
Lignende værker
-
Productividad de la mano de obra en construcciones civiles utilizando mapa de flujo de valor y carta de balance de cuadrilla
af: Edwin, Francisco Tello Oquendo
Udgivet: (2020) -
Guía práctica para comparar los rendimientos y uso de los equipos, mano de obra, materiales en los análisis de precios unitarios de los rubros de movimiento de tierra, estructura y mampostería de una edificación en la contratación pública
af: Valle Wong, Jhenner Orlando del
Udgivet: (2018) -
Guía práctica para comparar los rendimientos y uso de los equipos, mano de obra, materiales en los análisis de precios unitarios de los rubros de movimiento de tierra, estructura y mampostería de una edificación en la contratación pública
af: Valle Wong, Jhenner Orlando del
Udgivet: (2018) -
Límites en el monto de la ejecución en obras públicas y los contratos complementarios en el sector público, 2023.
af: Suárez Balón, Janny César
Udgivet: (2024) -
Planificación y presupuesto de obra de la construcción de Calles, escalinatas y peatonales en el Sector Perimetral Oeste Pre-Cooperativa Paraíso de La Flor – Parroquia Pascuales – y aplicación del método Lean Construction
af: Barbech Salazar, Bryan Aaron
Udgivet: (2022)