Análisis de rendimientos y diseño de un modelo de cálculo para el control de la maquinaria y mano de obra en proyectos de vías

It is not always possible to predict all the factors involved in the implementation of a project, but it is possible to approach to it so that there is no variation between what was planned and what was really carried out, since we can overestimate or underestimate the cost of the construction.

Saved in:
書目詳細資料
主要作者: Barragán Herrera, Nelson Bolivar (author)
其他作者: Román Merino, Ruth Alicia (author)
格式: bachelorThesis
語言:spa
出版: 2015
主題:
在線閱讀:http://dspace.unach.edu.ec/handle/51000/573
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!