Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista Pichincha

The “ready-made house” system of the Mutualista Pichincha Company offers to their clients top-quality housing and the fast assembly. Its dispatch depends on the production phase of the prefabricated elements and the final assembly phase of the product. The objective of this research work is to ident...

Descripció completa

Guardat en:
Dades bibliogràfiques
Autor principal: Gaibor Cujilema, José Luis (author)
Altres autors: Merino Layedra, Karen Elizabeth (author)
Format: bachelorThesis
Idioma:spa
Publicat: 2022
Matèries:
Accés en línia:http://dspace.unach.edu.ec/handle/51000/9088
Etiquetes: Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
_version_ 1863456564857274368
author Gaibor Cujilema, José Luis
author2 Merino Layedra, Karen Elizabeth
author2_role author
author_facet Gaibor Cujilema, José Luis
Merino Layedra, Karen Elizabeth
author_role author
collection Repositorio Universidad Nacional de Chimborazo
dc.contributor.none.fl_str_mv Andrade Valle, Alexis Iván
dc.creator.none.fl_str_mv Gaibor Cujilema, José Luis
Merino Layedra, Karen Elizabeth
dc.date.none.fl_str_mv 2022-05-18T13:20:55Z
2022-05-18T13:20:55Z
2022-05-18
dc.format.none.fl_str_mv 53 páginas
dc.identifier.none.fl_str_mv UNACH- FI-ICIV
http://dspace.unach.edu.ec/handle/51000/9088
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Riobamba, Universidad Nacional de Chimborazo
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Nacional de Chimborazo
instname:Universidad Nacional de Chimborazo
instacron:UNACH
dc.subject.none.fl_str_mv PREFABRICADOS
DESPERDICIOS
HERRAMIENTAS LEAN
dc.title.none.fl_str_mv Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista Pichincha
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description The “ready-made house” system of the Mutualista Pichincha Company offers to their clients top-quality housing and the fast assembly. Its dispatch depends on the production phase of the prefabricated elements and the final assembly phase of the product. The objective of this research work is to identify the existing waste in both mentioned phases, through the application of lean tools. For this purpose, a visual analysis of the current operation managed by the company was carried out. The data obtained allowed the calculation of productive and unproductive time and the classification of activities that add value (AV) and that do not add value (NAV), for a clearer vision of what happens within the processes, a value stream mapping was developed. (VSM) current where existing waste is distinguished and this gave way to the search for tools that help reduce or eliminate such waste. From this analysis in which the errors in the processes were identified, strategies were established to improve them and the future VSM was proposed.
eu_rights_str_mv openAccess
format bachelorThesis
id UNACH_4e34dcec6b46700b2699d4ded0ef2334
identifier_str_mv UNACH- FI-ICIV
instacron_str UNACH
institution UNACH
instname_str Universidad Nacional de Chimborazo
language spa
network_acronym_str UNACH
network_name_str Repositorio Universidad Nacional de Chimborazo
oai_identifier_str oai:localhost:51000/9088
publishDate 2022
publisher.none.fl_str_mv Riobamba, Universidad Nacional de Chimborazo
reponame_str Repositorio Universidad Nacional de Chimborazo
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazo
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista PichinchaGaibor Cujilema, José LuisMerino Layedra, Karen ElizabethPREFABRICADOSDESPERDICIOSHERRAMIENTAS LEANThe “ready-made house” system of the Mutualista Pichincha Company offers to their clients top-quality housing and the fast assembly. Its dispatch depends on the production phase of the prefabricated elements and the final assembly phase of the product. The objective of this research work is to identify the existing waste in both mentioned phases, through the application of lean tools. For this purpose, a visual analysis of the current operation managed by the company was carried out. The data obtained allowed the calculation of productive and unproductive time and the classification of activities that add value (AV) and that do not add value (NAV), for a clearer vision of what happens within the processes, a value stream mapping was developed. (VSM) current where existing waste is distinguished and this gave way to the search for tools that help reduce or eliminate such waste. From this analysis in which the errors in the processes were identified, strategies were established to improve them and the future VSM was proposed.El sistema casa lista de la empresa Mutualista Pichincha ofrece a sus clientes una vivienda de primera calidad y de rápido ensamblaje. Su despacho depende de la fase de producción de los elementos prefabricados y de la fase de montaje final del producto. El objetivo del presente trabajo de investigación es identificar los desperdicios existentes en ambas fases mencionadas, mediante la aplicación de herramientas lean. Para el efecto se realizó un análisis visual del funcionamiento actual que maneja la compañía. Los datos obtenidos permitieron el cálculo de tiempo productivo e improductivo y la clasificación de actividades que agregan valor (AV) y que no agregan valor (NAV), para una visión más clara de lo que sucede dentro de los procesos se elaboró un value stream mapping (VSM) actual donde se distinguen los desperdicios existentes y esto dio paso a la búsqueda de herramientas que ayudan a reducir o eliminar dichos desperdicios. A partir de este análisis en el cual se identificó los errores en los procesos, se estableció estrategias para el mejoramiento de los mismos y se planteó el VSM futuro.UNACH, EcuadorRiobamba, Universidad Nacional de ChimborazoAndrade Valle, Alexis Iván2022-05-18T13:20:55Z2022-05-18T13:20:55Z2022-05-18info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis53 páginasUNACH- FI-ICIVhttp://dspace.unach.edu.ec/handle/51000/9088spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Nacional de Chimborazoinstname:Universidad Nacional de Chimborazoinstacron:UNACH2022-07-23T08:04:39Zoai:localhost:51000/9088Institucionalhttp://dspace.unach.edu.ec/Universidad públicahttps://www.unach.edu.ec/http://dspace.unach.edu.ec/oai.Ecuador...opendoar:02022-07-23T08:04:39Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazofalse
spellingShingle Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista Pichincha
Gaibor Cujilema, José Luis
PREFABRICADOS
DESPERDICIOS
HERRAMIENTAS LEAN
status_str publishedVersion
title Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista Pichincha
title_full Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista Pichincha
title_fullStr Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista Pichincha
title_full_unstemmed Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista Pichincha
title_short Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista Pichincha
title_sort Pérdidas en prefabricados de hormigón, sujeto de estudio Mutualista Pichincha
topic PREFABRICADOS
DESPERDICIOS
HERRAMIENTAS LEAN
url http://dspace.unach.edu.ec/handle/51000/9088