Afectación al contratista por procesos de administración de los proyectos durante la ejecución de obras hidráulicas.
The main objective of this research study was to focus on the inefficient administrative processes in the management of water works can affect the scope, budget and timeframe of a project, thus directly affecting the contractor who has a contractual commitment with a public institution. It will anal...
Saved in:
| 主要作者: | |
|---|---|
| 格式: | masterThesis |
| 語言: | spa |
| 出版: |
2024
|
| 主題: | |
| 在線閱讀: | http://dspace.unach.edu.ec/handle/51000/12754 |
| 標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|