Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSM

The construction sector has been growing considerably, there are numerous investigations aimed at improving the construction processes. However, the design stage is an iterative and innovative process that requires several complex and interdependent tasks that are not as easy to measure as the produ...

Full description

Saved in:
Bibliographic Details
Main Author: Pancho Naranjo, Leonel Marcelo (author)
Other Authors: Inca Cujilema, Madeley Monserrath (author)
Format: bachelorThesis
Language:spa
Published: 2018
Subjects:
Online Access:http://dspace.unach.edu.ec/handle/51000/5176
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1858382434167422976
author Pancho Naranjo, Leonel Marcelo
author2 Inca Cujilema, Madeley Monserrath
author2_role author
author_facet Pancho Naranjo, Leonel Marcelo
Inca Cujilema, Madeley Monserrath
author_role author
collection Repositorio Universidad Nacional de Chimborazo
dc.contributor.none.fl_str_mv Castillo, Tito
dc.creator.none.fl_str_mv Pancho Naranjo, Leonel Marcelo
Inca Cujilema, Madeley Monserrath
dc.date.none.fl_str_mv 2018-11-12T15:35:21Z
2018-11-12T15:35:21Z
2018
dc.format.none.fl_str_mv 101p.
dc.identifier.none.fl_str_mv Facultad de Ingeniería.
ING-CIVIL
http://dspace.unach.edu.ec/handle/51000/5176
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Universidad Nacional de Chimborazo,2018
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Nacional de Chimborazo
instname:Universidad Nacional de Chimborazo
instacron:UNACH
dc.subject.none.fl_str_mv Diseño de Estructuras
Concreto Reforzado
Consecuencia
Costo
dc.title.none.fl_str_mv Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSM
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description The construction sector has been growing considerably, there are numerous investigations aimed at improving the construction processes. However, the design stage is an iterative and innovative process that requires several complex and interdependent tasks that are not as easy to measure as the production units. The Ecuadorian public sector does not have a value that reflects its productivity in the structural design stage. Consequently, the management of public resources (time and money) invested to design construction projects is unknown. The objective of this research was to calculate the productivity of the structural design departments in the public sector, the research method adapted the VSM tool to graphically represent the structural design process of a project and through the analysis of the balance chart was determined the percentage of productive time (TP), contributory time (TC) and non-contributory time (TNC) for each activity and the project. The results presented of the VSM were translated into time dedicated to a design and its cost. With these resources, productivity was determined by relating the number of elements designed per dedicated hour (PD) and by the relation of the cost of a project and the number of elements designed (PL). The research was applied to 4 Decentralized Autonomous Governments (GADs), and it was possible to quantify the performance during the structural design stage of 4 projects. The proposed methodology allows the calculation of structural design productivity, creating a reference for benchmarking between institutions.
eu_rights_str_mv openAccess
format bachelorThesis
id UNACH_8002e2f7c3ddd2640cb06bc5fc7ffcb8
identifier_str_mv Facultad de Ingeniería.
ING-CIVIL
instacron_str UNACH
institution UNACH
instname_str Universidad Nacional de Chimborazo
language spa
network_acronym_str UNACH
network_name_str Repositorio Universidad Nacional de Chimborazo
oai_identifier_str oai:localhost:51000/5176
publishDate 2018
publisher.none.fl_str_mv Universidad Nacional de Chimborazo,2018
reponame_str Repositorio Universidad Nacional de Chimborazo
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazo
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSMPancho Naranjo, Leonel MarceloInca Cujilema, Madeley MonserrathDiseño de EstructurasConcreto ReforzadoConsecuenciaCostoThe construction sector has been growing considerably, there are numerous investigations aimed at improving the construction processes. However, the design stage is an iterative and innovative process that requires several complex and interdependent tasks that are not as easy to measure as the production units. The Ecuadorian public sector does not have a value that reflects its productivity in the structural design stage. Consequently, the management of public resources (time and money) invested to design construction projects is unknown. The objective of this research was to calculate the productivity of the structural design departments in the public sector, the research method adapted the VSM tool to graphically represent the structural design process of a project and through the analysis of the balance chart was determined the percentage of productive time (TP), contributory time (TC) and non-contributory time (TNC) for each activity and the project. The results presented of the VSM were translated into time dedicated to a design and its cost. With these resources, productivity was determined by relating the number of elements designed per dedicated hour (PD) and by the relation of the cost of a project and the number of elements designed (PL). The research was applied to 4 Decentralized Autonomous Governments (GADs), and it was possible to quantify the performance during the structural design stage of 4 projects. The proposed methodology allows the calculation of structural design productivity, creating a reference for benchmarking between institutions.El sector de la construcción viene creciendo considerablemente, son numerosas las investigaciones orientadas a mejorar los procesos constructivos. Sin embargo, la etapa de diseño es un proceso iterativo e innovador que requiere de varias tareas complejas e interdependientes que no son tan fáciles de medir como las unidades de producción. El sector público ecuatoriano no cuenta con un valor que refleje su productividad en la etapa de diseño estructural. En consecuencia, se desconoce el manejo de los recursos públicos (tiempo y dinero) invertidos para diseñar proyectos de construcción. El objetivo de esta investigación fue calcular la productividad de los departamentos de diseño estructural en el sector público, el método de investigación adaptó la herramienta VSM para representar gráficamente el proceso de diseño estructural de un proyecto y mediante el análisis de la carta de balance se determinó el porcentaje de Tiempo Productivo (TP), Tiempo contributorio (TC) y Tiempo no contributorio (TNC) para cada actividad y del proyecto. Los resultados presentados del VSM se tradujeron a tiempo dedicado a un diseño y su costo. Con estos recursos se determinó la productividad relacionando la cantidad de elementos diseñados por hora dedicada (PD) y mediante la relación del costo de un proyecto y la cantidad de elementos diseñado (PL). La investigación se aplicó a 4 Gobiernos Autónomos Descentralizados (GADs), y se logró cuantificar el desempeño durante la etapa de diseño estructural de 4 proyectos. La metodología propuesta permite calcular la productividad de diseño estructural creando una referencia para evaluación comparativa entre instituciones.UNACH,Sede EcuadorUniversidad Nacional de Chimborazo,2018Castillo, Tito2018-11-12T15:35:21Z2018-11-12T15:35:21Z2018info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis101p.Facultad de Ingeniería.ING-CIVILhttp://dspace.unach.edu.ec/handle/51000/5176spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Nacional de Chimborazoinstname:Universidad Nacional de Chimborazoinstacron:UNACH2019-02-19T08:02:20Zoai:localhost:51000/5176Institucionalhttp://dspace.unach.edu.ec/Universidad públicahttps://www.unach.edu.ec/http://dspace.unach.edu.ec/oai.Ecuador...opendoar:02019-02-19T08:02:20Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazofalse
spellingShingle Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSM
Pancho Naranjo, Leonel Marcelo
Diseño de Estructuras
Concreto Reforzado
Consecuencia
Costo
status_str publishedVersion
title Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSM
title_full Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSM
title_fullStr Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSM
title_full_unstemmed Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSM
title_short Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSM
title_sort Productividad en el desarrollo de proyectos dentro del sector público utilizando el método VSM
topic Diseño de Estructuras
Concreto Reforzado
Consecuencia
Costo
url http://dspace.unach.edu.ec/handle/51000/5176