Propuesta de Creación de la Fábrica de Producción de Adoquines del Gobierno Parroquial de Calpi.
The main objective of this study was to obtain complete and detailed information for a feasibility study of a vehicle paving stone factory in the Calpi parish, given that these communities have problems related to the quality of the communication routes. Therefore, the Government Autonomous Decentra...
Сохранить в:
| Главный автор: | |
|---|---|
| Формат: | bachelorThesis |
| Язык: | spa |
| Опубликовано: |
2022
|
| Предметы: | |
| Online-ссылка: | http://dspace.unach.edu.ec/handle/51000/10069 |
| Метки: |
Добавить метку
Нет меток, Требуется 1-ая метка записи!
|
| Итог: | The main objective of this study was to obtain complete and detailed information for a feasibility study of a vehicle paving stone factory in the Calpi parish, given that these communities have problems related to the quality of the communication routes. Therefore, the Government Autonomous Decentralized Parish Santiago de Calpi, belonging to the Riobamba canton, has adopted road infrastructure construction as a means to leverage the economic and social development of the area. In this context, a survey was developed to collect information related to the market study, obtaining significant interest from the interviewed community. Likewise, it was established that there is an unsatisfied demand of 960,000.00 annual vehicular pavers, so the creation of a factory will allow the production of 4,000 pavers per day for an annual total of what would correspond to 100% of this demand. It was determined that the most convenient location for the development of the project is at the entrance to the Calpi parish. In addition, the price of the vehicular pavers will be $ 0.42. Finally, based on the economic-financial evaluation of the project, it was established that the investment required is $ 195.436,69. It was obtained that the proposed project has a profitability of 8,71%, the investment will be recovered in approximately 1.59 years, and the cost/benefit ratio is 1.31. The project is viable from a technical, economic, and financial perspective. |
|---|