Determinación del tiempo improductivo “Making do” y su relación con la pérdida económica en obras de Ingeniería Civil
There are different situations that generate unproductive times in Civil Engineering works, the purpose of this research is to publish about a new type of loss by flows, called "Making do" or “hacer por hacer”, this type of waste appears when an activity is carried out without considering...
Salvato in:
| Autore principale: | Adriano Amaguaya, María Verónica (author) |
|---|---|
| Natura: | bachelorThesis |
| Lingua: | spa |
| Pubblicazione: |
2018
|
| Soggetti: | |
| Accesso online: | http://dspace.unach.edu.ec/handle/51000/5192 |
| Tags: |
Nessun Tag, puoi essere il primo ad aggiungerne!!
|
Documenti analoghi
Documenti analoghi
-
Eliminación de tiempos improductivos en talleres Internacional.
di: Domínguez Bernita, Maiver Leonel
Pubblicazione: (2014) -
Mejoramiento continuo para reducir; los tiempos improductivos; el producto no conforme y los desperdicios en Plastigomez S.A. área de sellado.
di: Murillo Bueno, Christian Jair
Pubblicazione: (2011) -
Aplicación de técnicas de ingeniería para reducción de tiempos improductivos en Grupasa.
di: Ordóñez Jurado, Víctor Javier
Pubblicazione: (2011) -
Reducción de tiempos improductivos en la producción de marcadores JR en la Empresa Plastiuniversal S.A.
di: Jordán Ramírez, Elvis Eddy
Pubblicazione: (2006) -
Reducción de tiempos improductivos en la línea termo pack de la Empresa Plastro S.A.
di: Riofrío Rodríguez, Edwin Roberto
Pubblicazione: (2011)