Diseño del plan maestro de producción de la puerta enrollable en la empresa IMEV en Riobamba-Ecuador

To identify and analyze the points of delay in production, the times for each process were considered to determine the capacity of the operator or machinery. Various times for each process were extracted. The time take by an operator to manufacture a roller door is 2.91 hours. In an eight-hour shift...