Estudio de rendimientos de mano de obra y equipos en elproyecto "Implementación de un sistema integral de señalización horizontal y vertical, semáforos, vallas y reformas geométricas para las intersecciones del sistema ferroviario con la red vial estatal en el tramo Otavalo-Ibarra".
This investigation was made in order to study the performance of workforce in the project implementation of a comprehensive system of horizontal and vertical signalization, traffic lights, billboards and geometric reforms to the intersections for railway system with state road network in the section...
Saved in:
主要作者: | |
---|---|
格式: | bachelorThesis |
語言: | spa |
出版: |
2016
|
主題: | |
在線閱讀: | http://dspace.unach.edu.ec/handle/51000/1377 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
總結: | This investigation was made in order to study the performance of workforce in the project implementation of a comprehensive system of horizontal and vertical signalization, traffic lights, billboards and geometric reforms to the intersections for railway system with state road network in the section Otavalo-Ibarra. The type of investigation is of field and descriptive. At the first time, it was defined the size of each sample, in order to begin with making yields in different intersections contained in the field project. To this information was applied a methodology with many statistical parameters and so we are deleting data, so that the final data for performance calculating got to secure a 95% of statistical truth. Already obtained the data we have proceeded to calculate the real performance of workforce of sixteen items of the mentioned project that can be the data base of our city. With this performance they were calculated the analysis of unitary prices with the cost of workforce, equipment and materials current in the market, and it was made a comparison with the unitary prices of the project so we can determine some possible deviation of unitary prices. |
---|