Estudio de rendimientos de mano de obra y equipos en elproyecto "Implementación de un sistema integral de señalización horizontal y vertical, semáforos, vallas y reformas geométricas para las intersecciones del sistema ferroviario con la red vial estatal en el tramo Otavalo-Ibarra".
This investigation was made in order to study the performance of workforce in the project implementation of a comprehensive system of horizontal and vertical signalization, traffic lights, billboards and geometric reforms to the intersections for railway system with state road network in the section...
Spremljeno u:
Glavni autor: | |
---|---|
Format: | bachelorThesis |
Jezik: | spa |
Izdano: |
2016
|
Teme: | |
Online pristup: | http://dspace.unach.edu.ec/handle/51000/1377 |
Oznake: |
Dodaj oznaku
Bez oznaka, Budi prvi tko označuje ovaj zapis!
|