Estudio de rendimientos de mano de obra y equipos en elproyecto "Implementación de un sistema integral de señalización horizontal y vertical, semáforos, vallas y reformas geométricas para las intersecciones del sistema ferroviario con la red vial estatal en el tramo Otavalo-Ibarra".
This investigation was made in order to study the performance of workforce in the project implementation of a comprehensive system of horizontal and vertical signalization, traffic lights, billboards and geometric reforms to the intersections for railway system with state road network in the section...
Na minha lista:
Autor principal: | |
---|---|
Formato: | bachelorThesis |
Idioma: | spa |
Publicado em: |
2016
|
Assuntos: | |
Acesso em linha: | http://dspace.unach.edu.ec/handle/51000/1377 |
Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|