Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.

The objective of this thesis is to design a preventive maintenance management system for the extrusion process in INDUCUERDAS, based on the analysis of the criticality of the extrusion line equipment. This system seeks to optimize the availability of the equipment and reduce the risks of unexpected...

Descripció completa

Guardat en:
Dades bibliogràfiques
Autor principal: Castillo Pulgar, Gabriela Francisca (author)
Format: bachelorThesis
Idioma:spa
Publicat: 2025
Matèries:
Accés en línia:http://dspace.unach.edu.ec/handle/51000/14657
Etiquetes: Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
_version_ 1859016520159461376
author Castillo Pulgar, Gabriela Francisca
author_facet Castillo Pulgar, Gabriela Francisca
author_role author
collection Repositorio Universidad Nacional de Chimborazo
dc.contributor.none.fl_str_mv López Telenchana, Luis Stalin
dc.creator.none.fl_str_mv Castillo Pulgar, Gabriela Francisca
dc.date.none.fl_str_mv 2025-01-24T14:25:24Z
2025-01-24T14:25:24Z
2025-01-24
dc.format.none.fl_str_mv 83 páginas.
dc.identifier.none.fl_str_mv Castillo P., Gabriela F. (2025) Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS. (Tesis de grado). Universidad Nacional de Chimborazo. Riobamba, Ecuador.
UNACH-EC-FI-IIND
http://dspace.unach.edu.ec/handle/51000/14657
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Riobamba
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Nacional de Chimborazo
instname:Universidad Nacional de Chimborazo
instacron:UNACH
dc.subject.none.fl_str_mv Sistema
Gestión
Mantenimiento
Utilidad
dc.title.none.fl_str_mv Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description The objective of this thesis is to design a preventive maintenance management system for the extrusion process in INDUCUERDAS, based on the analysis of the criticality of the extrusion line equipment. This system seeks to optimize the availability of the equipment and reduce the risks of unexpected stoppages that affect productivity. Based on the criticality analysis, a preventive maintenance plan was designed that integrates both manufacturers recommendations and practices based on the experience of the companys technical personnel. In addition, maintenance routines were established to reduce the probability of failures and improve operational reliability. The proposed design includes the implementation of a criticality monitoring system, which facilitates the prioritization of equipment according to its impact on production. The capacity of the technical maintenance area was also evaluated, identifying the need for specific training and capacity building, especially by equipment manufacturers. In particular, the importance of having trained personnel to cover the night shift was highlighted, which would significantly reduce the risk of disabling the line and ensure proper handling of the equipment. The economic analysis of the project shows an expected profit of $39,478 and a return on investment (ROI) of 2.74, reflecting the economic viability of the proposed system. In addition, the formats for preventive maintenance activities were established and the availability of the necessary spare parts to deal with the most recurrent failures was guaranteed, which contributes to greater operating efficiency. In conclusion, the design of a preventive maintenance management system based on the criticality of the equipment allows improving the availability of the extrusion line, reducing unscheduled shutdowns and optimizing human and material resources, which translates into a significant increase in productivity and profitability for the company INDUCUERDAS.
eu_rights_str_mv openAccess
format bachelorThesis
id UNACH_ff11eed6a238dc2e100f31a67a24fd45
identifier_str_mv Castillo P., Gabriela F. (2025) Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS. (Tesis de grado). Universidad Nacional de Chimborazo. Riobamba, Ecuador.
UNACH-EC-FI-IIND
instacron_str UNACH
institution UNACH
instname_str Universidad Nacional de Chimborazo
language spa
network_acronym_str UNACH
network_name_str Repositorio Universidad Nacional de Chimborazo
oai_identifier_str oai:localhost:51000/14657
publishDate 2025
publisher.none.fl_str_mv Riobamba
reponame_str Repositorio Universidad Nacional de Chimborazo
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazo
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.Castillo Pulgar, Gabriela FranciscaSistemaGestiónMantenimientoUtilidadThe objective of this thesis is to design a preventive maintenance management system for the extrusion process in INDUCUERDAS, based on the analysis of the criticality of the extrusion line equipment. This system seeks to optimize the availability of the equipment and reduce the risks of unexpected stoppages that affect productivity. Based on the criticality analysis, a preventive maintenance plan was designed that integrates both manufacturers recommendations and practices based on the experience of the companys technical personnel. In addition, maintenance routines were established to reduce the probability of failures and improve operational reliability. The proposed design includes the implementation of a criticality monitoring system, which facilitates the prioritization of equipment according to its impact on production. The capacity of the technical maintenance area was also evaluated, identifying the need for specific training and capacity building, especially by equipment manufacturers. In particular, the importance of having trained personnel to cover the night shift was highlighted, which would significantly reduce the risk of disabling the line and ensure proper handling of the equipment. The economic analysis of the project shows an expected profit of $39,478 and a return on investment (ROI) of 2.74, reflecting the economic viability of the proposed system. In addition, the formats for preventive maintenance activities were established and the availability of the necessary spare parts to deal with the most recurrent failures was guaranteed, which contributes to greater operating efficiency. In conclusion, the design of a preventive maintenance management system based on the criticality of the equipment allows improving the availability of the extrusion line, reducing unscheduled shutdowns and optimizing human and material resources, which translates into a significant increase in productivity and profitability for the company INDUCUERDAS.El presente trabajo de tesis tiene como objetivo el diseño de un sistema de gestión de mantenimiento preventivo para el proceso de extrusión en la empresa INDUCUERDAS, con base en el análisis de la criticidad de los equipos de la línea de extrusión. Este sistema busca optimizar la disponibilidad de los equipos y reducir los riesgos de paros inesperados que afectan la productividad. A partir del análisis de criticidad, se diseñó un plan de mantenimiento preventivo que integra tanto las recomendaciones de los fabricantes como las prácticas basadas en la experiencia del personal técnico de la empresa. Además, se establecieron rutinas de mantenimiento que permiten reducir la probabilidad de fallas y mejorar la fiabilidad operativa. El diseño propuesto incluye la implementación de un sistema de monitoreo de criticidad, que facilita la priorización de los equipos según su impacto en la producción. Se evaluó también la capacidad del área técnica de mantenimiento, identificando la necesidad de formación y capacitación específica, especialmente por parte de los fabricantes de los equipos. En particular, se destacó la importancia de contar con personal capacitado para cubrir el turno nocturno, lo que disminuiría significativamente el riesgo de inhabilitar la línea y garantizaría una manipulación adecuada de los equipos. El análisis económico del proyecto muestra una utilidad esperada de $39,478 y un retorno sobre la inversión (ROI) de 2.74, lo que refleja la viabilidad económica del sistema propuesto. Asimismo, se establecieron los formatos de actividades de mantenimiento preventivo y se garantizó la disponibilidad de los repuestos necesarios para afrontar las fallas más recurrentes, lo que contribuye a una mayor eficiencia operativa. En conclusión, el diseño de un sistema de gestión de mantenimiento preventivo basado en la criticidad de los equipos permite mejorar la disponibilidad de la línea de extrusión, reducir los paros no programados y optimizar los recursos humanos y materiales, lo que se traduce en un incremento significativo de la productividad y la rentabilidad para la empresa INDUCUERDAS.UNACH, Ecuador.RiobambaLópez Telenchana, Luis Stalin2025-01-24T14:25:24Z2025-01-24T14:25:24Z2025-01-24info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis83 páginas.Castillo P., Gabriela F. (2025) Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS. (Tesis de grado). Universidad Nacional de Chimborazo. Riobamba, Ecuador.UNACH-EC-FI-IINDhttp://dspace.unach.edu.ec/handle/51000/14657spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Nacional de Chimborazoinstname:Universidad Nacional de Chimborazoinstacron:UNACH2025-11-14T08:02:30Zoai:localhost:51000/14657Institucionalhttp://dspace.unach.edu.ec/Universidad públicahttps://www.unach.edu.ec/http://dspace.unach.edu.ec/oai.Ecuador...opendoar:02025-11-14T08:02:30Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazofalse
spellingShingle Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.
Castillo Pulgar, Gabriela Francisca
Sistema
Gestión
Mantenimiento
Utilidad
status_str publishedVersion
title Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.
title_full Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.
title_fullStr Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.
title_full_unstemmed Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.
title_short Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.
title_sort Diseño de un sistema de gestión de mantenimiento preventivo para el proceso industrial de extrusión en la empresa de INDUCUERDAS.
topic Sistema
Gestión
Mantenimiento
Utilidad
url http://dspace.unach.edu.ec/handle/51000/14657