El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo Ecuatoriano

In private and state oil companies, the work carried out in distant places, working for fourteen consecutive days, having a descaso seven days or twenty-seven consecutive days of rest, pointing contravention of Article 47 Labour Code which determines the maximum workday is eight hours a day and fort...

Full beskrivning

Sparad:
Bibliografiska uppgifter
Huvudupphovsman: Jerez, Luis Alfonso (author)
Materialtyp: bachelorThesis
Språk:spa
Publicerad: 2015
Ämnen:
Länkar:http://dspace.unl.edu.ec/jspui/handle/123456789/8659
Taggar: Lägg till en tagg
Inga taggar, Lägg till första taggen!
_version_ 1857832917333442560
author Jerez, Luis Alfonso
author_facet Jerez, Luis Alfonso
author_role author
collection Repositorio Universidad Nacional de Loja
dc.contributor.none.fl_str_mv Astudillo Ontaneda, Augusto Patricio
dc.creator.none.fl_str_mv Jerez, Luis Alfonso
dc.date.none.fl_str_mv 2015-10-28T19:08:13Z
2015-10-28T19:08:13Z
2015
dc.format.none.fl_str_mv 103 p.
application/pdf
dc.identifier.none.fl_str_mv http://dspace.unl.edu.ec/jspui/handle/123456789/8659
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Loja
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Nacional de Loja
instname:Universidad Nacional de Loja
instacron:UNL
dc.subject.none.fl_str_mv CÓDIGO LABORAL
JORNADA LABORAL
VULNERACIÓN DE DERECHOS
MANDATO DE LEY
dc.title.none.fl_str_mv El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo Ecuatoriano
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description In private and state oil companies, the work carried out in distant places, working for fourteen consecutive days, having a descaso seven days or twenty-seven consecutive days of rest, pointing contravention of Article 47 Labour Code which determines the maximum workday is eight hours a day and forty hours a week. Also notes that the actual work on the ground is six hours a day and can only afford an additional, extraordinary or recovery time giving special protection to workers. Art. 50 of the Labour Code which limits five days a week, ie forty hours per week and designated as days of forced rest on Saturday and Sunday. This type of work is not covered by the Labour Code, this code is very clear that a person should work more than five consecutive days and two, that is, Saturday and Sunday are mandatory rest. Look to the Labour Code is that the person does not suffer from fatigue and occupational accidents are reduced. These forms of work, fourteen days of work for seven of rest or twenty days of work for seven of rest, are not regulated in the Labour Code, by such circumstances it is important to regulate this type or work modality and working code for more adequate employment in these sectors of production application, and is set on Sunday furlough, to thereby not constitutional rights of workers are violated. The type of contract fourteen days of work for seven days off or twenty days of work for seven of rest that are signed between a worker and the company and is not governed by the Labour Code, is contrary to the basis of objective law where rights and duties to be unobserved or violated the legal uncertainty of public and private institutions is generated develop For the legal basis, it becomes essential that the Labour Code contracts fourteen days off work for seven or twenty-seven working days of rest normatice, this will allow the law, that for reasons of work, distribution adequate time work and the implementation of mechanisms that facilitate more flexible use of it; in particular, to make possible the implementation of nonuniform distributions of working time
eu_rights_str_mv openAccess
format bachelorThesis
id UNL_25ee398a29a80c657bbdedd93eea7f5b
instacron_str UNL
institution UNL
instname_str Universidad Nacional de Loja
language spa
network_acronym_str UNL
network_name_str Repositorio Universidad Nacional de Loja
oai_identifier_str oai:dspace.unl.edu.ec:123456789/8659
publishDate 2015
publisher.none.fl_str_mv Loja
reponame_str Repositorio Universidad Nacional de Loja
repository.mail.fl_str_mv *
repository.name.fl_str_mv Repositorio Universidad Nacional de Loja - Universidad Nacional de Loja
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo EcuatorianoJerez, Luis AlfonsoCÓDIGO LABORALJORNADA LABORALVULNERACIÓN DE DERECHOSMANDATO DE LEYIn private and state oil companies, the work carried out in distant places, working for fourteen consecutive days, having a descaso seven days or twenty-seven consecutive days of rest, pointing contravention of Article 47 Labour Code which determines the maximum workday is eight hours a day and forty hours a week. Also notes that the actual work on the ground is six hours a day and can only afford an additional, extraordinary or recovery time giving special protection to workers. Art. 50 of the Labour Code which limits five days a week, ie forty hours per week and designated as days of forced rest on Saturday and Sunday. This type of work is not covered by the Labour Code, this code is very clear that a person should work more than five consecutive days and two, that is, Saturday and Sunday are mandatory rest. Look to the Labour Code is that the person does not suffer from fatigue and occupational accidents are reduced. These forms of work, fourteen days of work for seven of rest or twenty days of work for seven of rest, are not regulated in the Labour Code, by such circumstances it is important to regulate this type or work modality and working code for more adequate employment in these sectors of production application, and is set on Sunday furlough, to thereby not constitutional rights of workers are violated. The type of contract fourteen days of work for seven days off or twenty days of work for seven of rest that are signed between a worker and the company and is not governed by the Labour Code, is contrary to the basis of objective law where rights and duties to be unobserved or violated the legal uncertainty of public and private institutions is generated develop For the legal basis, it becomes essential that the Labour Code contracts fourteen days off work for seven or twenty-seven working days of rest normatice, this will allow the law, that for reasons of work, distribution adequate time work and the implementation of mechanisms that facilitate more flexible use of it; in particular, to make possible the implementation of nonuniform distributions of working timeEn las empresas petroleras privadas y estatales, las labores que se realizan en los lugares distantes, se trabaja de catorce días consecutivos, teniendo un descaso de siete días, o de veintiún días consecutivos y siete de descanso, contraviniendo lo que señala el artículo 47 del Código del Trabajo en el que se determina que la jornada máxima de trabajo será de ocho horas al día, y cuarenta horas a la semana. Señala también que el trabajo efectivo en el subsuelo será de seis horas diarias y sólo podrá permitirse una hora suplementaria, extraordinaria o de recuperación dándole protección especial al trabajador. El Art. 50 del Código del Trabajo que limita en cinco jornadas a la semana, es decir de cuarenta horas semanales y señala como días de descanso forzoso los sábados y domingos. Esta modalidad de trabajo no está contemplada en el Código del Trabajo, este código es muy claro que una persona debe trabajar máximo cinco días continuos y dos, o sea el sábado y domingo son de descanso obligatorio. Lo que busca el Código del Trabajo es que la persona no sufra de fatiga laboral y se reduzcan los accidentes de trabajo. Estas modalidades de trabajo, de catorce días de trabajo por siete de descanso o de veintiún días de trabajo por siete de descanso, no están regulados en el Código del Trabajo, por tales circunstancias es importante normar este tipo o modalidad laboral en e código de trabajo para aplicación más adecuada de la relación laboral en estos sectores de la producción, y se establezca el día domingo de descanso obligatorio, para con ello no se vulneren derechos constitucionales de los trabajadores. La modalidad de contrato de catorce días de trabajo por siete días de descanso o de veintiún días de trabajo por siete de descanso que se firman entre un trabajador y la empresa y no esté regulado en el Código de Trabajo, se contrapone al fundamento del derecho objetivo en el que se desarrollan derechos y deberes que al ser inobservados o violentados se genera la inseguridad jurídica de las instituciones públicas como privadas Por la fundamentación legal, se torna indispensable que en el Código del Trabajo se normatice los contratos de catorce días de trabajo por siete de descanso, o de veintiún días de trabajo por siete de descanso, esto permitirá la legalidad, que por circunstancias de labores, una distribución del tiempo de trabajo adecuada y la implementación de mecanismos que faciliten la utilización más flexible del mismo; en especial, que hagan posible la puesta en marcha de distribuciones no uniformes de tiempo de trabajoLojaAstudillo Ontaneda, Augusto Patricio2015-10-28T19:08:13Z2015-10-28T19:08:13Z2015info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis103 p.application/pdfhttp://dspace.unl.edu.ec/jspui/handle/123456789/8659spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Nacional de Lojainstname:Universidad Nacional de Lojainstacron:UNL2025-05-02T12:52:42Zoai:dspace.unl.edu.ec:123456789/8659Institucionalhttps://dspace.unl.edu.ec/Universidad públicahttps://unl.edu.ec/https://dspace.unl.edu.ec/oaiEcuador***opendoar:02025-05-02T12:52:42falseInstitucionalhttps://dspace.unl.edu.ec/Universidad públicahttps://unl.edu.ec/https://dspace.unl.edu.ec/oai*Ecuador***opendoar:02025-05-02T12:52:42Repositorio Universidad Nacional de Loja - Universidad Nacional de Lojafalse
spellingShingle El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo Ecuatoriano
Jerez, Luis Alfonso
CÓDIGO LABORAL
JORNADA LABORAL
VULNERACIÓN DE DERECHOS
MANDATO DE LEY
status_str publishedVersion
title El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo Ecuatoriano
title_full El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo Ecuatoriano
title_fullStr El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo Ecuatoriano
title_full_unstemmed El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo Ecuatoriano
title_short El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo Ecuatoriano
title_sort El incumplimiento de la jornada laboral en relación al descanso forzoso dispuesto en el artículo cincuenta del Código del Trabajo Ecuatoriano
topic CÓDIGO LABORAL
JORNADA LABORAL
VULNERACIÓN DE DERECHOS
MANDATO DE LEY
url http://dspace.unl.edu.ec/jspui/handle/123456789/8659