Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.

This research work consists of a technical proposal of choice of the exploitation system for the free-use area about building materials, ‘El Tablón GMZ’; code 592157, located in the ‘El Tablon’area, canton of Zamora, province of Zamora Chinchipe, which has an area of 5 mining hectares, where the ari...

Volledige beschrijving

Bewaard in:
Bibliografische gegevens
Hoofdauteur: Jiménez Rosales, Yulissa Raquel (author)
Formaat: bachelorThesis
Taal:spa
Gepubliceerd in: 2023
Onderwerpen:
Online toegang:https://dspace.unl.edu.ec/jspui/handle/123456789/27115
Tags: Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
_version_ 1857833194633560064
author Jiménez Rosales, Yulissa Raquel
author_facet Jiménez Rosales, Yulissa Raquel
author_role author
collection Repositorio Universidad Nacional de Loja
dc.contributor.none.fl_str_mv Rengel Jiménez, Fernando Javier
dc.creator.none.fl_str_mv Jiménez Rosales, Yulissa Raquel
dc.date.none.fl_str_mv 2023-05-30T20:43:53Z
2023-05-30T20:43:53Z
2023-05-30
dc.format.none.fl_str_mv 172 p.
application/pdf
dc.identifier.none.fl_str_mv https://dspace.unl.edu.ec/jspui/handle/123456789/27115
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Universidad Nacional de Loja
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Nacional de Loja
instname:Universidad Nacional de Loja
instacron:UNL
dc.subject.none.fl_str_mv <SISTEMA DE EXPLOTACIÓN>< RESERVAS DE MATERIAL> < CICLOS DE TRABAJO>< CARACTERÍSTICAS GEOMECÁNICAS>
dc.title.none.fl_str_mv Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description This research work consists of a technical proposal of choice of the exploitation system for the free-use area about building materials, ‘El Tablón GMZ’; code 592157, located in the ‘El Tablon’area, canton of Zamora, province of Zamora Chinchipe, which has an area of 5 mining hectares, where the arid material to be exploited is the disaggregated granite. This belongs to the ‘Batholith of Zamora’, is mainly made up of quartz, plagioclase and feldspars, is mainly used for maintenance and filling of the final disposal cells of the landfill and for maintenance of the roads of the canton. The investigation work was developed in three stages: first, the pre-field stage, where the collection of bibliographic information of the area, legal documentation, etc. were carried out. Second, the field stage, where the information on site such as topography, geology, work cycles, etc. was corroborated. In function of using of the worksheets elaborated and the laboratory period, which allowed to know the geo-mechanical characteristics of the arid material mined in the area and its comparison with current regulations. Lastly, the office stage that consisted in the information processing, map making, multi-criteria analysis to define the exploitation system suitable for the area, calculations of machinery performance, identification of time used on each of the activities completed, in addition to the modeling of the exploitation system proposed, based on the raised formulas. The outcomes obtained allowed us to determine that the mining method is open pit and the optimal exploitation system for the area is quarry on hillside. through uphill banks, this considering the safety of the workers of ‘GAD Zamora’ who work in the mining area, in addition to the location of a stock zone inside the area, where its benefit lies in the reduction of work cycle times, greater performance of the machinery used and consequently increased daily production of the area of free use. Keywords: Exploitation system, material reserves, working cycles, geomechanical characteristics
eu_rights_str_mv openAccess
format bachelorThesis
id UNL_d314ee9f3ad990c2acae5e4189d65bf4
instacron_str UNL
institution UNL
instname_str Universidad Nacional de Loja
language spa
network_acronym_str UNL
network_name_str Repositorio Universidad Nacional de Loja
oai_identifier_str oai:dspace.unl.edu.ec:123456789/27115
publishDate 2023
publisher.none.fl_str_mv Universidad Nacional de Loja
reponame_str Repositorio Universidad Nacional de Loja
repository.mail.fl_str_mv *
repository.name.fl_str_mv Repositorio Universidad Nacional de Loja - Universidad Nacional de Loja
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.Jiménez Rosales, Yulissa Raquel<SISTEMA DE EXPLOTACIÓN>< RESERVAS DE MATERIAL> < CICLOS DE TRABAJO>< CARACTERÍSTICAS GEOMECÁNICAS>This research work consists of a technical proposal of choice of the exploitation system for the free-use area about building materials, ‘El Tablón GMZ’; code 592157, located in the ‘El Tablon’area, canton of Zamora, province of Zamora Chinchipe, which has an area of 5 mining hectares, where the arid material to be exploited is the disaggregated granite. This belongs to the ‘Batholith of Zamora’, is mainly made up of quartz, plagioclase and feldspars, is mainly used for maintenance and filling of the final disposal cells of the landfill and for maintenance of the roads of the canton. The investigation work was developed in three stages: first, the pre-field stage, where the collection of bibliographic information of the area, legal documentation, etc. were carried out. Second, the field stage, where the information on site such as topography, geology, work cycles, etc. was corroborated. In function of using of the worksheets elaborated and the laboratory period, which allowed to know the geo-mechanical characteristics of the arid material mined in the area and its comparison with current regulations. Lastly, the office stage that consisted in the information processing, map making, multi-criteria analysis to define the exploitation system suitable for the area, calculations of machinery performance, identification of time used on each of the activities completed, in addition to the modeling of the exploitation system proposed, based on the raised formulas. The outcomes obtained allowed us to determine that the mining method is open pit and the optimal exploitation system for the area is quarry on hillside. through uphill banks, this considering the safety of the workers of ‘GAD Zamora’ who work in the mining area, in addition to the location of a stock zone inside the area, where its benefit lies in the reduction of work cycle times, greater performance of the machinery used and consequently increased daily production of the area of free use. Keywords: Exploitation system, material reserves, working cycles, geomechanical characteristicsEl presente trabajo investigativo consiste en una propuesta técnica de elección del sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, ubicada en el sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe, que cuenta con una extensión de 5 hectáreas mineras, donde el material árido a explotar es el granito disgregado, perteneciente al Batolito de Zamora, compuesto principalmente por cuarzo, plagioclasa y feldespatos, que es utilizado principalmente para el mantenimiento y relleno de las celdas de disposición final del relleno sanitario y para mantenimiento de las vías del cantón. El trabajo de investigación se realizó en tres fases: primero la fase pre-campo en donde se realizó la recolección de información bibliográfica del área, documentación legal, etc.; fase de campo en la que se corroboró la información in situ como: topografía, geología, ciclos de trabajo, etc., haciendo uso de las fichas de trabajo elaboradas, la fase de laboratorio, que permitió conocer las características geomecánicas del material árido explotado en el área y su comparación con la normativa vigente y por último la fase de oficina que consistió en el procesamiento de información, realización de mapas, análisis multicriterio para definir el sistema de explotación adecuado al área, cálculos de rendimiento de maquinaria, identificación de tiempos ocupados en cada una de las actividades realizadas, además del modelamiento del sistema de explotación propuesto, a partir de las fórmulas planteadas. Los resultados obtenidos permitieron determinar que el método de explotación es a cielo abierto y el sistema de explotación óptimo para el área es cantera en ladera a través de bancos ascendentes, esto considerando la seguridad de los trabajadores del GAD Zamora que laboran en el área minera, además de la ubicación de una zona de stock dentro del área, donde su beneficio radica en la reducción de los tiempos en los ciclos de trabajo, mayor rendimiento de la maquinaria utilizada y por consiguiente aumento de la producción diaria del área de libre aprovechamiento. Palabras Clave: Sistema de explotación, reservas de material, ciclos de trabajo, características geomecánicas.Universidad Nacional de LojaRengel Jiménez, Fernando Javier2023-05-30T20:43:53Z2023-05-30T20:43:53Z2023-05-30info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis172 p.application/pdfhttps://dspace.unl.edu.ec/jspui/handle/123456789/27115spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Nacional de Lojainstname:Universidad Nacional de Lojainstacron:UNL2025-05-02T18:20:31Zoai:dspace.unl.edu.ec:123456789/27115Institucionalhttps://dspace.unl.edu.ec/Universidad públicahttps://unl.edu.ec/https://dspace.unl.edu.ec/oaiEcuador***opendoar:02025-05-02T18:20:31falseInstitucionalhttps://dspace.unl.edu.ec/Universidad públicahttps://unl.edu.ec/https://dspace.unl.edu.ec/oai*Ecuador***opendoar:02025-05-02T18:20:31Repositorio Universidad Nacional de Loja - Universidad Nacional de Lojafalse
spellingShingle Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.
Jiménez Rosales, Yulissa Raquel
<SISTEMA DE EXPLOTACIÓN>< RESERVAS DE MATERIAL> < CICLOS DE TRABAJO>< CARACTERÍSTICAS GEOMECÁNICAS>
status_str publishedVersion
title Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.
title_full Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.
title_fullStr Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.
title_full_unstemmed Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.
title_short Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.
title_sort Elección de sistema de explotación para el área de libre aprovechamiento de materiales de construcción, El Tablón GMZ; código 592157, sector El Tablón, cantón Zamora, provincia de Zamora Chinchipe.
topic <SISTEMA DE EXPLOTACIÓN>< RESERVAS DE MATERIAL> < CICLOS DE TRABAJO>< CARACTERÍSTICAS GEOMECÁNICAS>
url https://dspace.unl.edu.ec/jspui/handle/123456789/27115