Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.

The objective of this research is to carry out an analysis of the characteristics of the provisions contained in the work contracts to be signed by the State and the successful bidder, to determine if there is a regulatory deficiency in the work award contracts, with respect to the guarantees subseq...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Autor principal: Jara Viñan, Lenin Santiago (author)
Formato: bachelorThesis
Idioma:spa
Publicado em: 2022
Assuntos:
Acesso em linha:https://dspace.unl.edu.ec/jspui/handle/123456789/25116
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
_version_ 1857833185642020864
author Jara Viñan, Lenin Santiago
author_facet Jara Viñan, Lenin Santiago
author_role author
collection Repositorio Universidad Nacional de Loja
dc.contributor.none.fl_str_mv Rengel Maldonado, Paz Piedad
dc.creator.none.fl_str_mv Jara Viñan, Lenin Santiago
dc.date.none.fl_str_mv 2022-07-18T14:06:26Z
2022-07-18T14:06:26Z
2022-07-18
dc.format.none.fl_str_mv 110 p.
application/pdf
dc.identifier.none.fl_str_mv https://dspace.unl.edu.ec/jspui/handle/123456789/25116
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Universidad Nacional de Loja
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Nacional de Loja
instname:Universidad Nacional de Loja
instacron:UNL
dc.subject.none.fl_str_mv <DERECHO>
<CONTRATOS DE OBRA>
<TRABAJO>
<SUELO>
dc.title.none.fl_str_mv Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description The objective of this research is to carry out an analysis of the characteristics of the provisions contained in the work contracts to be signed by the State and the successful bidder, to determine if there is a regulatory deficiency in the work award contracts, with respect to the guarantees subsequent to delivery and final reception of the work. Determining requirements are the effects produced by the normative deficiency in the construction contracts carried out by the State, with respect to the construction or soil vices that the contractor or employees harm from knowing due to their work. Determine if there is a need to reform the Organic Law of Public Procurement or its Regulations, regarding the guarantees that may exist in the work contracts after the final delivery and reception of the same. For the realization of some objectives, a doctrinal, conceptual and legal study was carried out, the methodology was based on various study methods such as scientific, inductive, deductive, analytical, exegetical, hermeneutical, comparative and statistical. The methodological techniques applied were, in the first instance, the documentary collection technique, where from the theoretical framework important themes are externalized in order to have correct foundations about the research topic, techniques such as the interview with legal professionals and the survey to the students of the University, this, with the purpose of knowing their position and opinion regarding the subject of study. As one of the main results, 73.3% had knowledge of what a construction defect, soil defect or material defect is, as well as 66.7% agree that public resources do not they are adequately covered by Ecuadorian legislation under the Civil Code and the Organic Law of the National Public Procurement System. On the other hand, cases such as the Coca Codo Sinclair hydroelectric plant and the Esmeraldas Refinery are also analyzed, which until now are national news due to the vices found in their constructions. That is why it is proposed to make a reform to the Organic Law of the National System of Public Procurement of Ecuador, specifically to article 74 and that it is also considered a section for hidden construction defects. The relevance of this reform proposal is due to the well-known cases of corruption that have occurred in public procurement processes, always bearing in mind that public finances must be conducted in a sustainable, responsible and transparent manner, seeking the economic stability of Ecuadorians.
eu_rights_str_mv openAccess
format bachelorThesis
id UNL_d3da65b27de2aaff84ca9b88c043e876
instacron_str UNL
institution UNL
instname_str Universidad Nacional de Loja
language spa
network_acronym_str UNL
network_name_str Repositorio Universidad Nacional de Loja
oai_identifier_str oai:dspace.unl.edu.ec:123456789/25116
publishDate 2022
publisher.none.fl_str_mv Universidad Nacional de Loja
reponame_str Repositorio Universidad Nacional de Loja
repository.mail.fl_str_mv *
repository.name.fl_str_mv Repositorio Universidad Nacional de Loja - Universidad Nacional de Loja
repository_id_str 0
spelling Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.Jara Viñan, Lenin Santiago<DERECHO><CONTRATOS DE OBRA><TRABAJO><SUELO>The objective of this research is to carry out an analysis of the characteristics of the provisions contained in the work contracts to be signed by the State and the successful bidder, to determine if there is a regulatory deficiency in the work award contracts, with respect to the guarantees subsequent to delivery and final reception of the work. Determining requirements are the effects produced by the normative deficiency in the construction contracts carried out by the State, with respect to the construction or soil vices that the contractor or employees harm from knowing due to their work. Determine if there is a need to reform the Organic Law of Public Procurement or its Regulations, regarding the guarantees that may exist in the work contracts after the final delivery and reception of the same. For the realization of some objectives, a doctrinal, conceptual and legal study was carried out, the methodology was based on various study methods such as scientific, inductive, deductive, analytical, exegetical, hermeneutical, comparative and statistical. The methodological techniques applied were, in the first instance, the documentary collection technique, where from the theoretical framework important themes are externalized in order to have correct foundations about the research topic, techniques such as the interview with legal professionals and the survey to the students of the University, this, with the purpose of knowing their position and opinion regarding the subject of study. As one of the main results, 73.3% had knowledge of what a construction defect, soil defect or material defect is, as well as 66.7% agree that public resources do not they are adequately covered by Ecuadorian legislation under the Civil Code and the Organic Law of the National Public Procurement System. On the other hand, cases such as the Coca Codo Sinclair hydroelectric plant and the Esmeraldas Refinery are also analyzed, which until now are national news due to the vices found in their constructions. That is why it is proposed to make a reform to the Organic Law of the National System of Public Procurement of Ecuador, specifically to article 74 and that it is also considered a section for hidden construction defects. The relevance of this reform proposal is due to the well-known cases of corruption that have occurred in public procurement processes, always bearing in mind that public finances must be conducted in a sustainable, responsible and transparent manner, seeking the economic stability of Ecuadorians.La presente investigación tiene por objetivo. Realizar un análisis sobre cuáles son las disposiciones que contienen los contratos de obra para ser suscritos por el Estado y el adjudicatario, Determinar si existe deficiencia normativa en los contratos de adjudicación de obra, respecto a garantías posteriores a la entrega y recepción definitiva de la obra. Determinar cuáles son los efectos que produce la deficiencia normativa en los contratos de obra realizados por el Estado, respecto a los vicios de construcción o de suelo que el contratista o empleados deberían de conocer en razón de su trabajo. Determinar si existe necesidad de Reformar la Ley Orgánica del Sistema Nacional de Contratación Pública o su Reglamento, respecto de las garantías que deberían existir en los contratos de obra posterior a la entrega y recepción definitiva de la misma. Para la concreción de mencionados objetivos se realizó un estudio doctrinario, conceptual y jurídico, la metodología se basó en diversos métodos como científico, inductivo, deductivo, analítico, exegético, hermenéutico, comparativo y estadístico. Las técnicas metodológicas aplicadas fueron, en primera instancia, la técnica de acopio documental, donde a partir del marco teórico se exteriorizan temáticas importantes para poder tener fundamentos acertados acerca del tema de investigación, se utilizó también técnicas como la entrevista a profesionales de derecho y la encuesta al alumnado de la Universidad, esto, con la finalidad de conocer su posición y opinión en cuanto al tema de estudio. Como uno de los principales resultados se obtuvo que, el 73,3% si tiene conocimiento de lo que es es un vicio de construcción, vicio de suelo o vicio de materiales, al igual que el 66,7% coincide en que los recursos públicos no se encuentran amparados adecuadamente con la legislación ecuatoriana bajo el Código Civil y Ley Orgánica del Sistema Nacional de Contratación Pública. Por otra parte, también se analizan casos como el de la hidroeléctrica Coca Codo Sinclair y la Refinería de Esmeraldas, que hasta el presente son noticia nacional por cuanto los vicios encontrados en sus construcciones. Es por ello que se propone hacer una reforma a la Ley Orgánica del Sistema Nacional de Contratación Pública, ecuatoriano, específicamente al artículo 74 y que además se considere un apartado para los vicios ocultos de construcción. La pertinencia de esta propuesta de reforma se debe a los ya conocidos casos de corrupción que se han dado en los procesos de contratación pública, teniendo siempre presente que las finanzas públicas deberán conducirse de forma sostenible, responsable y transparente procurando la estabilidad económica de los ecuatorianos.Universidad Nacional de LojaRengel Maldonado, Paz Piedad2022-07-18T14:06:26Z2022-07-18T14:06:26Z2022-07-18info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis110 p.application/pdfhttps://dspace.unl.edu.ec/jspui/handle/123456789/25116spainfo:eu-repo/semantics/openAccessreponame:Repositorio Universidad Nacional de Lojainstname:Universidad Nacional de Lojainstacron:UNL2025-05-02T18:10:17Zoai:dspace.unl.edu.ec:123456789/25116Institucionalhttps://dspace.unl.edu.ec/Universidad públicahttps://unl.edu.ec/https://dspace.unl.edu.ec/oaiEcuador***opendoar:02025-05-02T18:10:17falseInstitucionalhttps://dspace.unl.edu.ec/Universidad públicahttps://unl.edu.ec/https://dspace.unl.edu.ec/oai*Ecuador***opendoar:02025-05-02T18:10:17Repositorio Universidad Nacional de Loja - Universidad Nacional de Lojafalse
spellingShingle Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.
Jara Viñan, Lenin Santiago
<DERECHO>
<CONTRATOS DE OBRA>
<TRABAJO>
<SUELO>
status_str publishedVersion
title Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.
title_full Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.
title_fullStr Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.
title_full_unstemmed Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.
title_short Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.
title_sort Deficiencia normativa en los contratos de obra realizados por el estado, en lo referente a la garantía de los diez años subsiguientes a la entrega definitiva de la obra, respecto de los vicios de construcción o de suelo, que el contratista o sus empleados debían conocer en razón de su trabajo.
topic <DERECHO>
<CONTRATOS DE OBRA>
<TRABAJO>
<SUELO>
url https://dspace.unl.edu.ec/jspui/handle/123456789/25116