AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022

The Curricular Integration work entitled “Compliance Audit of the Environmental Management Plan for the Catamayo Thermal Power Plant of Empresa Eléctrica Regional del Sur S.A, Period 2022”, was developed as a requirement prior to obtaining the title of Bachelor of Accounting and Auditing. based on t...

Ful tanımlama

Kaydedildi:
Detaylı Bibliyografya
Yazar: Cañart Espinoza, Daniela Damaris (author)
Materyal Türü: bachelorThesis
Dil:spa
Baskı/Yayın Bilgisi: 2024
Konular:
Online Erişim:https://dspace.unl.edu.ec/jspui/handle/123456789/30168
Etiketler: Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
_version_ 1857833221963644928
author Cañart Espinoza, Daniela Damaris
author_facet Cañart Espinoza, Daniela Damaris
author_role author
collection Repositorio Universidad Nacional de Loja
dc.contributor.none.fl_str_mv Añazco Narváez., María Enma
dc.creator.none.fl_str_mv Cañart Espinoza, Daniela Damaris
dc.date.none.fl_str_mv 2024-06-28T16:23:59Z
2024-06-28T16:23:59Z
2024-07-28
dc.format.none.fl_str_mv 263 p.
application/pdf
dc.identifier.none.fl_str_mv https://dspace.unl.edu.ec/jspui/handle/123456789/30168
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Universidad Nacional de Loja
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Nacional de Loja
instname:Universidad Nacional de Loja
instacron:UNL
dc.subject.none.fl_str_mv CONTABILIDAD Y AUDITORIA
EMPRESA ELECTRICA REGIONAL DEL SUR
PLAN DE MANEJO AMBIENTAL
CATAMAYO
dc.title.none.fl_str_mv AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description The Curricular Integration work entitled “Compliance Audit of the Environmental Management Plan for the Catamayo Thermal Power Plant of Empresa Eléctrica Regional del Sur S.A, Period 2022”, was developed as a requirement prior to obtaining the title of Bachelor of Accounting and Auditing. based on the following objectives: the identification of environmental legal requirements based on the environmental management plan of the Catamayo Thermal Power Plant; determine the degree of compliance with the legal provisions and environmental regulations applicable to the plant and prepare the final environmental audit report that includes the respective comments, conclusions and recommendations based on the findings obtained, to guide the making of correct decisions and the improvement of the entity's environmental management. The procedure was framed according to what is indicated in the Environmental Management and Control Manual of Dr. Fernando Bustos, which includes Phase I: Planning or Pre-audit, which began with a prior diagnosis of information collection, determination of critical areas and determination of procedures. to be applied in the execution phase; Phase II “In-situ” Audit, the matrices were prepared to determine the degree of compliance with the environmental legal provisions, followed by making the narrative records according to the deficiencies found; Phase III: Communication of Results, the Audit Report was prepared; which is composed of the respective comments, conclusions and recommendations of the deficiencies found such as: cleaning of the interior and exterior of the facilities is not carried out, existence of scrap metal within the facilities and it is not located in a designated place with its respective signage, the formation of weeds and excessive grass, waterlogging due to inadequate drainage, the first aid kit does not have the necessary equipment, there is deterioration in some individual containers for the collection of non-hazardous solid waste and not all of them have a lid and cover, Safety Plan Outdated Environmental Management.
eu_rights_str_mv openAccess
format bachelorThesis
id UNL_e1052a92be03dc2c7e4eca12f16e03eb
instacron_str UNL
institution UNL
instname_str Universidad Nacional de Loja
language spa
network_acronym_str UNL
network_name_str Repositorio Universidad Nacional de Loja
oai_identifier_str oai:dspace.unl.edu.ec:123456789/30168
publishDate 2024
publisher.none.fl_str_mv Universidad Nacional de Loja
reponame_str Repositorio Universidad Nacional de Loja
repository.mail.fl_str_mv *
repository.name.fl_str_mv Repositorio Universidad Nacional de Loja - Universidad Nacional de Loja
repository_id_str 0
spelling AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022Cañart Espinoza, Daniela DamarisCONTABILIDAD Y AUDITORIAEMPRESA ELECTRICA REGIONAL DEL SURPLAN DE MANEJO AMBIENTALCATAMAYOThe Curricular Integration work entitled “Compliance Audit of the Environmental Management Plan for the Catamayo Thermal Power Plant of Empresa Eléctrica Regional del Sur S.A, Period 2022”, was developed as a requirement prior to obtaining the title of Bachelor of Accounting and Auditing. based on the following objectives: the identification of environmental legal requirements based on the environmental management plan of the Catamayo Thermal Power Plant; determine the degree of compliance with the legal provisions and environmental regulations applicable to the plant and prepare the final environmental audit report that includes the respective comments, conclusions and recommendations based on the findings obtained, to guide the making of correct decisions and the improvement of the entity's environmental management. The procedure was framed according to what is indicated in the Environmental Management and Control Manual of Dr. Fernando Bustos, which includes Phase I: Planning or Pre-audit, which began with a prior diagnosis of information collection, determination of critical areas and determination of procedures. to be applied in the execution phase; Phase II “In-situ” Audit, the matrices were prepared to determine the degree of compliance with the environmental legal provisions, followed by making the narrative records according to the deficiencies found; Phase III: Communication of Results, the Audit Report was prepared; which is composed of the respective comments, conclusions and recommendations of the deficiencies found such as: cleaning of the interior and exterior of the facilities is not carried out, existence of scrap metal within the facilities and it is not located in a designated place with its respective signage, the formation of weeds and excessive grass, waterlogging due to inadequate drainage, the first aid kit does not have the necessary equipment, there is deterioration in some individual containers for the collection of non-hazardous solid waste and not all of them have a lid and cover, Safety Plan Outdated Environmental Management.El trabajo de Integración Curricular titulado “Auditoria de Cumplimiento al Plan de Manejo Ambiental a la Central Térmica de Catamayo de la Empresa Eléctrica Regional del Sur S.A, Periodo 2022”, se desarrolló como requerimiento previo a la obtención del título de Licenciada en Contabilidad y Auditoría teniendo como base los siguientes objetivos; la identificación de requisitos legales ambientales en base al plan de manejo ambiental de la Central Térmica de Catamayo; determinar el grado de cumplimiento de las disposiciones legales y reglamentos ambientales aplicables a la central y elaborar el informe final de Auditoría ambiental donde se incluyan los respectivos comentarios, conclusiones y recomendaciones en base a los hallazgos obtenidos, para orientar la toma de decisiones acertadas y el mejoramiento de la gestión ambiental de la entidad. El procedimiento se enmarco según lo que indica el Manual de Gestión y Control Ambiental del Dr. Fernando Bustos, que comprende Fase I: Planificación o Preauditoria lo que se inició con un diagnóstico previo de recopilación de información, determinación de áreas críticas y determinación de procedimientos a aplicar en la fase de ejecución; Fase II Auditoria “In-situ” se elaboró las matrices para determinar el grado de cumplimiento de las disposiciones legales ambientales, seguido realizando las cédulas narrativas de acuerdo a las falencias encontradas; Fase III: Comunicación de Resultados se elaboró el Informe de Auditoría; el cual está compuesto por los respectivos comentarios, conclusiones y recomendaciones de las falencias encontradas tales son: no se realiza la limpieza del interior y exterior de las instalaciones, existencia de chatarra dentro de las instalaciones y no está ubicada en un lugar destinado con su respectiva señalización, la formación de maleza y pasto excesivo, encharcamiento por drenaje inadecuado, el botiquín de primeros auxilios no tiene dotación necesaria, existen deterioro en algunos recipientes individuales para la recolección de desechos sólidos no peligrosos y no todos cuentan con tapa y funda, Plan de Manejo Ambiental desactualizado.Universidad Nacional de LojaAñazco Narváez., María Enma2024-06-28T16:23:59Z2024-06-28T16:23:59Z2024-07-28info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis263 p.application/pdfhttps://dspace.unl.edu.ec/jspui/handle/123456789/30168spainfo:eu-repo/semantics/openAccessreponame:Repositorio Universidad Nacional de Lojainstname:Universidad Nacional de Lojainstacron:UNL2025-05-02T22:53:11Zoai:dspace.unl.edu.ec:123456789/30168Institucionalhttps://dspace.unl.edu.ec/Universidad públicahttps://unl.edu.ec/https://dspace.unl.edu.ec/oaiEcuador***opendoar:02025-05-02T22:53:11falseInstitucionalhttps://dspace.unl.edu.ec/Universidad públicahttps://unl.edu.ec/https://dspace.unl.edu.ec/oai*Ecuador***opendoar:02025-05-02T22:53:11Repositorio Universidad Nacional de Loja - Universidad Nacional de Lojafalse
spellingShingle AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022
Cañart Espinoza, Daniela Damaris
CONTABILIDAD Y AUDITORIA
EMPRESA ELECTRICA REGIONAL DEL SUR
PLAN DE MANEJO AMBIENTAL
CATAMAYO
status_str publishedVersion
title AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022
title_full AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022
title_fullStr AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022
title_full_unstemmed AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022
title_short AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022
title_sort AUDITORÍA DE CUMPLIMIENTO AL PLAN DE MANEJO AMBIENTAL A LA CENTRAL TÉRMICA DE CATAMAYO DE LA EMPRESA ELÉCTRICA REGIONAL DEL SUR S.A., PERIODO 2022
topic CONTABILIDAD Y AUDITORIA
EMPRESA ELECTRICA REGIONAL DEL SUR
PLAN DE MANEJO AMBIENTAL
CATAMAYO
url https://dspace.unl.edu.ec/jspui/handle/123456789/30168