Diagnóstico de las instalaciones eléctricas del taller industrial tec-mec durante el período comprendido 2014.
In the present work describes the methodology of redesign of the electrical system the Industrial Workshop TEC-MEC, for which first proceeded to carry out the lifting of loads, and then assess the situation of the current installation and function to this propose a plan of improvements. On initial i...
Salvato in:
| Autore principale: | |
|---|---|
| Natura: | bachelorThesis |
| Lingua: | spa |
| Pubblicazione: |
2015
|
| Soggetti: | |
| Accesso online: | http://dspace.unl.edu.ec/jspui/handle/123456789/18153 |
| Tags: |
Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
|
Lascia un commento!