Proyecto de factibilidad para la creación de una empresa para procesamiento de lavado y pulido de papa del cantón Cañar y su comercialización en la ciudad de Cuenca, provincia del Azuay

The feasibility project for the creation of a company to process, wash and polish potatoes from the Cañar canton and market them in the city of Cuenca, province of Azuay, was carried out with the following objectives: to conduct a market study to determine the demand and supply of the product by sup...

Πλήρης περιγραφή

Αποθηκεύτηκε σε:
Λεπτομέρειες βιβλιογραφικής εγγραφής
Κύριος συγγραφέας: Chimborazo Morocho, Luis Efraín (author)
Μορφή: bachelorThesis
Γλώσσα:spa
Έκδοση: 2022
Θέματα:
Διαθέσιμο Online:https://dspace.unl.edu.ec/jspui/handle/123456789/25275
Ετικέτες: Προσθήκη ετικέτας
Δεν υπάρχουν, Καταχωρήστε ετικέτα πρώτοι!
Περιγραφή
Περίληψη:The feasibility project for the creation of a company to process, wash and polish potatoes from the Cañar canton and market them in the city of Cuenca, province of Azuay, was carried out with the following objectives: to conduct a market study to determine the demand and supply of the product by supermarkets and, based on this, to determine the unsatisfied demand; technical study to determine the size and location of the company, the engineering of the project and the organizational design; the financial study to determine the amount of investments, total and unit costs, its selling price as well as to elaborate the basic financial statements and finally to determine the break-even point; the financial evaluation to determine the feasibility of the proposal based on the indicators. The research is descriptive, using the deductive, inductive, analytical, mathematical and statistical methods; on the other hand, research techniques such as bibliographic review, survey and interview were also used to analyze the information gathered. The results that allowed the feasibility are; the NPV (Net Present Value) giving the results of 241,769.79 dollars, Internal Rate of Return (IRR) equivalent to 83.50%, which is higher than the opportunity cost, likewise the benefit - cost ratio was determined which is 29 cents for every dollar invested, the investment will be recovered in 2 years, 3 months and 27 days, the project supports 14.20%, increased costs and 11.20%, in the decrease of income. Therefore, according to this result it is recommended the execution of the project.