Análisis del potencial energético del río Toachi para la generación hidroeléctrica.
This article details how the primary studies are specified to establish the flow of energy power generation and principally the turbines design flow, starting from the analysis of how determine the flow of a basin and also the methods to define the runoff flow which generates the rainfalls in the ba...
Saved in:
| Main Author: | Gutiérrez Jiménez, Francisco Heriberto (author) |
|---|---|
| Format: | bachelorThesis |
| Language: | spa |
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://dspace.ups.edu.ec/handle/123456789/11998 |
| Tags: |
No Tags, Be the first to tag this record!
|
Similar Items
-
Despacho económico de generación hidroeléctrica y termoeléctrica usando programación dinámica
by: Pinzón Masache, Stanislao Ronaldo
Published: (2020) -
Estudio de prefactibilidad para la generación hidroeléctrica en el río Toachi, en la parroquia Sigchos, cantón Sigchos, provincia de Cotopaxi-Ecuador, 2022
by: García Alarcón, Wilson Alberto
Published: (2023) -
Diseño y simulación hidráulica para una central hidroeléctrica con una capacidad de generación de 16.8 mw
by: Mena Lema, Edwin Daniel
Published: (2015) -
Estudio de factibilidad para la implementación de un aerogenerador para generación de energía eléctrica en la zona de Cayambe
by: Lechón Necpas, Edwin Cesar
Published: (2016) -
Modelamiento de un micro aerogenerador en sistemas de generación distribuida para el sector residencial
by: Tituaña de la Vega, Mario Fernando
Published: (2015)