Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón Quito

Due to the population growth in the city of Quito, the surrounding suburban parishes have experienced during the last decades, a considerable population increase, coming from the city and provinces. Thus the Miranda Alto neighborhood, started more than 20 years ago, as a housing cooperative, divided...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autor: Vaca Brito, Christian Andrés (author)
Médium: bachelorThesis
Jazyk:spa
Vydáno: 2017
Témata:
On-line přístup:http://dspace.ups.edu.ec/handle/123456789/14105
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
_version_ 1863428233107603456
author Vaca Brito, Christian Andrés
author_facet Vaca Brito, Christian Andrés
author_role author
collection Repositorio Universidad Politécnica Salesiana
dc.contributor.none.fl_str_mv Soria Pugo, María Gabriela
dc.creator.none.fl_str_mv Vaca Brito, Christian Andrés
dc.date.none.fl_str_mv 2017-04-19T19:57:28Z
2017-04-19T19:57:28Z
2017-03
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv http://dspace.ups.edu.ec/handle/123456789/14105
dc.language.none.fl_str_mv spa
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Politécnica Salesiana
instname:Universidad Politécnica Salesiana
instacron:UPS
dc.subject.none.fl_str_mv INGENIERÍA SANITARIA
ALCANTARILLADO RURAL
dc.title.none.fl_str_mv Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón Quito
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description Due to the population growth in the city of Quito, the surrounding suburban parishes have experienced during the last decades, a considerable population increase, coming from the city and provinces. Thus the Miranda Alto neighborhood, started more than 20 years ago, as a housing cooperative, divided by sectors Miranda Alto and the Miranda Grande Commune, these originate in the delivery of lots to the villagers of the Hacienda Miranda in the process of Agrarian Reform more than 30 years ago. In turn, these lots are subdivided, and transferring in inheritance, which with the construction of houses are increasing the population of the sector. For the South-Eastern parishes of Conocoto and Amaguaña, Empresa Pública Metropolitana de Agua Potable y Saneamiento (EPMAPS) was executed in previous years project called Tesalia; therefore consideration is being given to the planning of sewage works to guarantee an environmentally sustainable service, contributing to the improvement of living conditions and health of the inhabitants of Miranda Alto neighborhood. In the study phase, a sewer with an independent system and a sewage system with a combined system were used as alternatives, with which its pre-feasibility and feasibility were analyzed, based on technical and economic aspects. So it was concluded that the second alternative is the most suitable for the neighborhood. Based on the topography of the sector, this system has two discharges to the existing network in Rio Napo Street, which is the main access to the Miranda Alto neighborhood. The project investment is US $ 881,606.01 which represents a favorable economic balance and the construction is technically executable. Finally, the sheet corresponding to the environmental management plan is made, according to the current laws and based on the analysis of environmental impacts.
eu_rights_str_mv openAccess
format bachelorThesis
id UPS_92bc42e0524a82dc35b6e521140cf579
instacron_str UPS
institution UPS
instname_str Universidad Politécnica Salesiana
language spa
network_acronym_str UPS
network_name_str Repositorio Universidad Politécnica Salesiana
oai_identifier_str oai:dspace.ups.edu.ec:123456789/14105
publishDate 2017
reponame_str Repositorio Universidad Politécnica Salesiana
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Politécnica Salesiana - Universidad Politécnica Salesiana
repository_id_str 1737
spelling Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón QuitoVaca Brito, Christian AndrésINGENIERÍA SANITARIAALCANTARILLADO RURALDue to the population growth in the city of Quito, the surrounding suburban parishes have experienced during the last decades, a considerable population increase, coming from the city and provinces. Thus the Miranda Alto neighborhood, started more than 20 years ago, as a housing cooperative, divided by sectors Miranda Alto and the Miranda Grande Commune, these originate in the delivery of lots to the villagers of the Hacienda Miranda in the process of Agrarian Reform more than 30 years ago. In turn, these lots are subdivided, and transferring in inheritance, which with the construction of houses are increasing the population of the sector. For the South-Eastern parishes of Conocoto and Amaguaña, Empresa Pública Metropolitana de Agua Potable y Saneamiento (EPMAPS) was executed in previous years project called Tesalia; therefore consideration is being given to the planning of sewage works to guarantee an environmentally sustainable service, contributing to the improvement of living conditions and health of the inhabitants of Miranda Alto neighborhood. In the study phase, a sewer with an independent system and a sewage system with a combined system were used as alternatives, with which its pre-feasibility and feasibility were analyzed, based on technical and economic aspects. So it was concluded that the second alternative is the most suitable for the neighborhood. Based on the topography of the sector, this system has two discharges to the existing network in Rio Napo Street, which is the main access to the Miranda Alto neighborhood. The project investment is US $ 881,606.01 which represents a favorable economic balance and the construction is technically executable. Finally, the sheet corresponding to the environmental management plan is made, according to the current laws and based on the analysis of environmental impacts.Debido al crecimiento poblacional en la ciudad de Quito, las parroquias suburbanas aledañas, han experimentado durante las últimas décadas, un incremento de población considerable, proveniente de la ciudad y provincias. Así el barrio Miranda Alto, inicia hace más de 20 años, como una cooperativa de vivienda, dividida por sectores Miranda Alto y la Comuna Miranda Grande estos tienen origen en la entrega de lotes a los comuneros de la hacienda Miranda en el proceso de Reforma Agraria de hace más de 30 años. A su vez, estos lotes se van subdividiendo, y transfiriendo en herencias, que con la construcción de viviendas van incrementando la población del sector. Para las parroquias Sur-orientales de Conocoto y Amaguaña, la Empresa Pública Metropolitana de Agua Potable y Saneamiento (EPMAPS) realizo en años anteriores el proyecto de agua potable denominado Tesalia, por tanto se está considerando la planificación de obras de alcantarillado que garantice un servicio ambientalmente sustentable, contribuyendo con el mejoramiento de las condiciones de vida y de salud de los habitantes del Barrio Miranda Alto. En la fase de estudio se tomó como alternativas, un alcantarillado con un sistema independiente y un alcantarillado con un sistema combinado, con los cuales se analizó su pre-factibilidad y factibilidad, en base a los aspectos técnicos y económicos. Por lo que se concluyó que la segunda alternativa es la más adecuada para el barrio. En base a la topografía realizada del sector, este sistema posee dos descargas a la red existente en la calle Rio Napo, la misma que es el acceso principal al barrio Miranda Alto. La inversión del proyecto es de $881.606,01 dólares americanos los mismos que representan un balance económico favorable y la construcción es técnicamente ejecutable. Finalmente, se realiza la ficha correspondiente al plan de manejo ambiental, de acuerdo a las leyes vigentes y en base al análisis de impactos ambientales.Soria Pugo, María Gabriela2017-04-19T19:57:28Z2017-04-19T19:57:28Z2017-03info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesisapplication/pdfhttp://dspace.ups.edu.ec/handle/123456789/14105spainfo:eu-repo/semantics/openAccessreponame:Repositorio Universidad Politécnica Salesianainstname:Universidad Politécnica Salesianainstacron:UPS2019-01-01T18:52:35Zoai:dspace.ups.edu.ec:123456789/14105Institucionalhttps://dspace.ups.edu.ec/Institución privadahttps://www.ups.edu.ec/https://dspace.ups.edu.ec/oai.Ecuador...opendoar:17372019-01-01T18:52:35Repositorio Universidad Politécnica Salesiana - Universidad Politécnica Salesianafalse
spellingShingle Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón Quito
Vaca Brito, Christian Andrés
INGENIERÍA SANITARIA
ALCANTARILLADO RURAL
status_str publishedVersion
title Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón Quito
title_full Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón Quito
title_fullStr Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón Quito
title_full_unstemmed Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón Quito
title_short Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón Quito
title_sort Ampliación del Alcantarillado Combinado del Barrio Miranda Alto, Parroquia de Amaguaña - Cantón Quito
topic INGENIERÍA SANITARIA
ALCANTARILLADO RURAL
url http://dspace.ups.edu.ec/handle/123456789/14105