Diseño sismo resistente de 3 viviendas tipo y alcantarillado combinado para la vía principal de la comunidad San Pablito de Agua Longo, parroquia Tupigachi, cantón Pedro Moncayo, provincia de Pichincha

This project involves the construction of combined sewer system on the main access road to the community, this being a primary service. To this end they have been studied as are hydrological, geological and geotechnical environmental impact. The design was made based on EPMAPS and MIDUVI standards....

詳細記述

保存先:
書誌詳細
第一著者: Mora Muñoz, Javier Alejandro (author)
その他の著者: Constante Agualsaca, Diana Tamara (author)
フォーマット: bachelorThesis
言語:spa
出版事項: 2016
主題:
オンライン・アクセス:http://dspace.ups.edu.ec/handle/123456789/12618
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
その他の書誌記述
要約:This project involves the construction of combined sewer system on the main access road to the community, this being a primary service. To this end they have been studied as are hydrological, geological and geotechnical environmental impact. The design was made based on EPMAPS and MIDUVI standards. Similarly a treatment plant for wastewater with an upward anaerobic filter was designed. With the information obtained respective planes, volumes of work, budget and schedule valued performed. Similarly the respective environmental assessment and corresponding management plan was held The sector also has a community tourism program where tourists are part of the families in the area. However the facilities provided to visitors do not have adequate infrastructure, damaging the landscape and tourism. To improve the appearance raised three models of earthquake resistant housing and whose architectural design has in line with the sector where they are, with traditional materials sector. The housing design has been based on the JUNAC and NEC -15 standards For this purpose the design of the foundation slab, wooden structural elements (beams, joists, columns and chercha) was performed for each of the houses. With these elements appropriate architectural, structural, sanitary and electrical plans was performed. Similarly budgets and schedules with which you can start the execution of the work was done.