Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV

Demand grows in Ecuador between 5% and 7% per year, to cover this growth need new generation projects and new transmission projects. The bigger project in Ecuador will be the Coca Codo Sinclair with 1500 MW of power, this ability will be transmitted to the big load center that is Quito by the transm...

Szczegółowa specyfikacja

Zapisane w:
Opis bibliograficzny
1. autor: Jaramillo Segarra, Diego Andrés (author)
Format: bachelorThesis
Język:spa
Wydane: 2011
Hasła przedmiotowe:
Dostęp online:https://dspace.ups.edu.ec/handle/123456789/1877
Etykiety: Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
_version_ 1858988377816170496
author Jaramillo Segarra, Diego Andrés
author_facet Jaramillo Segarra, Diego Andrés
author_role author
collection Repositorio Universidad Politécnica Salesiana
dc.contributor.none.fl_str_mv Santos Narváez, Benigno Ignacio
dc.creator.none.fl_str_mv Jaramillo Segarra, Diego Andrés
dc.date.none.fl_str_mv 2011-06
2011-06
2011-06
dc.format.none.fl_str_mv application/pdf
application/pdf
dc.identifier.none.fl_str_mv https://dspace.ups.edu.ec/handle/123456789/1877
dc.language.none.fl_str_mv spa
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Politécnica Salesiana
instname:Universidad Politécnica Salesiana
instacron:UPS
dc.subject.none.fl_str_mv INGENIERÍA ELÉCTRICA
ANALIZADORES DE REDES ELÉCTRICAS
REDES ELÉCTRICAS
ANÁLISIS ECONÓMICO
TRANSMISIÓN DE ENERGÍA ELÉCTRICA
CENTRALES ELÉCTRICAS
dc.title.none.fl_str_mv Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description Demand grows in Ecuador between 5% and 7% per year, to cover this growth need new generation projects and new transmission projects. The bigger project in Ecuador will be the Coca Codo Sinclair with 1500 MW of power, this ability will be transmitted to the big load center that is Quito by the transmission line to 500 KV Coca Codo Sinclair - El Inga (Pifo), to this lines is going to connect with transmission lines El Inga (Pifo) - Yaguachi - Sopladora, to join the project Sopladora. However in the world there are other levels of EHV as 345 KV and 750 KV, which can be used, that is the reason why made a technical - economic comparison of these levels of voltage with the proposed project of 500 KV, to determine the appropriate option. Using a power flow study in the year 2016 have been obtained values of power losses in transmission lines Coca Codo Sinclair - The Inga (Pifo) and the whole system of transmission lines proposed, using data on other systems EHV employees worldwide. Of the three voltage levels tested, the inversion in the alternative to 345 KV is less, however the power and energy losses are greater in this alternative, so the economic losses are also higher than the other two systems of voltage. In this study reached to determine the most optimal system voltage in transmission lines Coca Codo Sinclair - The Inga (Pifo) - Yaguachi - Sopladora is the alternative to 345 KV, with a cable ACAR 1250. In this alternative, the Liquid Present Value is greater than the project to 500 KV and 750 KV alternative, so this project is more feasible for implementation in Ecuador.
eu_rights_str_mv openAccess
format bachelorThesis
id UPS_a7fa7d9708a1e4ff7a30397bcf2774ff
instacron_str UPS
institution UPS
instname_str Universidad Politécnica Salesiana
language spa
network_acronym_str UPS
network_name_str Repositorio Universidad Politécnica Salesiana
oai_identifier_str oai:dspace.ups.edu.ec:123456789/1877
publishDate 2011
reponame_str Repositorio Universidad Politécnica Salesiana
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Politécnica Salesiana - Universidad Politécnica Salesiana
repository_id_str 1737
spelling Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KVJaramillo Segarra, Diego AndrésINGENIERÍA ELÉCTRICAANALIZADORES DE REDES ELÉCTRICASREDES ELÉCTRICASANÁLISIS ECONÓMICOTRANSMISIÓN DE ENERGÍA ELÉCTRICACENTRALES ELÉCTRICASDemand grows in Ecuador between 5% and 7% per year, to cover this growth need new generation projects and new transmission projects. The bigger project in Ecuador will be the Coca Codo Sinclair with 1500 MW of power, this ability will be transmitted to the big load center that is Quito by the transmission line to 500 KV Coca Codo Sinclair - El Inga (Pifo), to this lines is going to connect with transmission lines El Inga (Pifo) - Yaguachi - Sopladora, to join the project Sopladora. However in the world there are other levels of EHV as 345 KV and 750 KV, which can be used, that is the reason why made a technical - economic comparison of these levels of voltage with the proposed project of 500 KV, to determine the appropriate option. Using a power flow study in the year 2016 have been obtained values of power losses in transmission lines Coca Codo Sinclair - The Inga (Pifo) and the whole system of transmission lines proposed, using data on other systems EHV employees worldwide. Of the three voltage levels tested, the inversion in the alternative to 345 KV is less, however the power and energy losses are greater in this alternative, so the economic losses are also higher than the other two systems of voltage. In this study reached to determine the most optimal system voltage in transmission lines Coca Codo Sinclair - The Inga (Pifo) - Yaguachi - Sopladora is the alternative to 345 KV, with a cable ACAR 1250. In this alternative, the Liquid Present Value is greater than the project to 500 KV and 750 KV alternative, so this project is more feasible for implementation in Ecuador.La demanda en el Ecuador crece entre el 5% y el 7% anual, para cubrir este crecimiento se necesitan nuevos proyectos de generación y por ende nuevos proyectos de transmisión. El proyecto más grande del Ecuador será el de Coca Codo Sinclair con 1500 MW de potencia, esta capacidad se transmitirá hacia el gran centro de carga que es Quito mediante la Línea de Transmisión a 500 KV Coca Codo Sinclair – El Inga (Pifo). A estas líneas se unen las líneas de transmisión El Inga (Pifo) – Yaguachi – Sopladora, que unirá el proyecto Sopladora. Por otra parte en el mundo existen otros niveles de EHV como 345 KV y 750 KV, que pueden ser utilizados, es por esto que se realiza una comparación técnica – económica de estos niveles de voltaje con el proyecto planteado a 500 KV, para determinar la opción más apropiada. Mediante un estudio del flujo de potencia en el año 2016 se han obtenido valores de pérdidas de potencia en las líneas de transmisión Coca Codo Sinclair – El Inga (Pifo) y en todo el sistema de líneas de transmisión planteadas, utilizando datos referentes de otros sistemas de EHV empleados a nivel mundial. De los tres niveles de voltaje analizados la inversión en la alternativa a 345 KV es menor, sin embargo las pérdidas de potencia y energía son mayores en esta alternativa, por lo tanto las pérdidas económicas también serán superiores a los otros dos sistemas de voltaje. En este estudio se llega a determinar que el sistema de voltaje óptimo en las líneas de transmisión Coca Codo Sinclair – El Inga (Pifo) – Yaguachi – Sopladora es la alternativa a 345 KV, con un conductor 1250 ACAR. En esta alternativa, el valor Actual Liquido es mayor que del proyecto a 500 KV y a la alternativa a 750 KV, por lo tanto es más viable para su aplicación en el Ecuador.Santos Narváez, Benigno Ignacio2011-062011-062011-06info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesisapplication/pdfapplication/pdfhttps://dspace.ups.edu.ec/handle/123456789/1877spainfo:eu-repo/semantics/openAccessreponame:Repositorio Universidad Politécnica Salesianainstname:Universidad Politécnica Salesianainstacron:UPS2025-03-20T16:19:24Zoai:dspace.ups.edu.ec:123456789/1877Institucionalhttps://dspace.ups.edu.ec/Institución privadahttps://www.ups.edu.ec/https://dspace.ups.edu.ec/oai.Ecuador...opendoar:17372025-03-20T16:19:24Repositorio Universidad Politécnica Salesiana - Universidad Politécnica Salesianafalse
spellingShingle Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
Jaramillo Segarra, Diego Andrés
INGENIERÍA ELÉCTRICA
ANALIZADORES DE REDES ELÉCTRICAS
REDES ELÉCTRICAS
ANÁLISIS ECONÓMICO
TRANSMISIÓN DE ENERGÍA ELÉCTRICA
CENTRALES ELÉCTRICAS
status_str publishedVersion
title Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
title_full Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
title_fullStr Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
title_full_unstemmed Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
title_short Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
title_sort Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
topic INGENIERÍA ELÉCTRICA
ANALIZADORES DE REDES ELÉCTRICAS
REDES ELÉCTRICAS
ANÁLISIS ECONÓMICO
TRANSMISIÓN DE ENERGÍA ELÉCTRICA
CENTRALES ELÉCTRICAS
url https://dspace.ups.edu.ec/handle/123456789/1877