Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV
Demand grows in Ecuador between 5% and 7% per year, to cover this growth need new generation projects and new transmission projects. The bigger project in Ecuador will be the Coca Codo Sinclair with 1500 MW of power, this ability will be transmitted to the big load center that is Quito by the transm...
Na minha lista:
| Autor principal: | |
|---|---|
| Formato: | bachelorThesis |
| Idioma: | spa |
| Publicado em: |
2011
|
| Assuntos: | |
| Acesso em linha: | https://dspace.ups.edu.ec/handle/123456789/1877 |
| Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|