Análisis técnico económico de la futura línea de transmisión Coca Codo Sinclair-Pifo a 500KV

Demand grows in Ecuador between 5% and 7% per year, to cover this growth need new generation projects and new transmission projects. The bigger project in Ecuador will be the Coca Codo Sinclair with 1500 MW of power, this ability will be transmitted to the big load center that is Quito by the transm...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Glavni avtor: Jaramillo Segarra, Diego Andrés (author)
Format: bachelorThesis
Jezik:spa
Izdano: 2011
Teme:
Online dostop:https://dspace.ups.edu.ec/handle/123456789/1877
Oznake: Označite
Brez oznak, prvi označite!