Modelo de gestión de control de desempeño, para los equipos de trabajo dentro de la línea de calor de la empresa Indurama S.A.
In this investigation, the Hoshin Kanry methodology was used, it was found that waste was reduced by 26% between periods. This was achieved because the members of the work teams participated directly in the problem encountered, this methodology increased the participation of the collaborators from 5...
Uloženo v:
| Hlavní autor: | |
|---|---|
| Médium: | masterThesis |
| Jazyk: | spa |
| Vydáno: |
2022
|
| Témata: | |
| On-line přístup: | http://dspace.ups.edu.ec/handle/123456789/21985 |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | In this investigation, the Hoshin Kanry methodology was used, it was found that waste was reduced by 26% between periods. This was achieved because the members of the work teams participated directly in the problem encountered, this methodology increased the participation of the collaborators from 5% to 40%. |
|---|