Modelo de gestión de control de desempeño, para los equipos de trabajo dentro de la línea de calor de la empresa Indurama S.A.
In this investigation, the Hoshin Kanry methodology was used, it was found that waste was reduced by 26% between periods. This was achieved because the members of the work teams participated directly in the problem encountered, this methodology increased the participation of the collaborators from 5...
Kaydedildi:
| Yazar: | Serrano Alvarado, Edwin Fernando (author) |
|---|---|
| Materyal Türü: | masterThesis |
| Dil: | spa |
| Baskı/Yayın Bilgisi: |
2022
|
| Konular: | |
| Online Erişim: | http://dspace.ups.edu.ec/handle/123456789/21985 |
| Etiketler: |
Etiket eklenmemiş, İlk siz ekleyin!
|
Benzer Materyaller
-
Control interno de la partida presupuestaria de adquisición de materiales y repuestos de Refinería Esmeraldas
Yazar:: Pineda Salazar, Karina Elizabeth
Baskı/Yayın Bilgisi: (2016) -
Diseño de una estrategia para disminuir el desperdicio en la planta de producción de la Empresa Indurama S.A.
Yazar:: Paltán Orellana, Edy Rafael
Baskı/Yayın Bilgisi: (2007) -
Propuesta de mejora mediante la gestión por procesos en la linea ferrotecnia de la empresa Carpinteria Internacional Cia. Ltda.
Yazar:: Inga Chalco, Cesar Andrés
Baskı/Yayın Bilgisi: (2024) -
Propuesta de implementación de herramientas Lean Manufacturing para reducir tiempos de preparación en la línea de ensamble de cocinas y cocinetas en la empresa Fibroacero S.A.
Yazar:: Guerrero Beltrán, Paulina del Cisne
Baskı/Yayın Bilgisi: (2023) -
Implementación de estrategias y herramientas del sistema global de manufactura en la línea de galvanizado de la empresa Tugalt S.A.
Yazar:: Cornejo Illescas, Christian Hugo
Baskı/Yayın Bilgisi: (2020)