La Contratación Pública y su impacto en la Ejecución Presupuestaria del Gobierno Autónomo Descentralizado Municipal del Cantón Vinces. 2022

The present investigation shows the existing weakness regarding budget execution and the way in which public procurement has an impact. The objective was to determine the way in which public procurement impacts the budget execution of the Municipal GAD of the Canton Vinces. The proposed methodology...

Full description

Saved in:
Bibliographic Details
Main Author: Narváez Rendón, Tanya Isabel (author)
Format: masterThesis
Published: 2024
Subjects:
Online Access:http://dspace.utb.edu.ec/handle/49000/15644
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The present investigation shows the existing weakness regarding budget execution and the way in which public procurement has an impact. The objective was to determine the way in which public procurement impacts the budget execution of the Municipal GAD of the Canton Vinces. The proposed methodology was based on a non-experimental design with a type of Applied, Mixed, Descriptive-Explanatory research, since it sought to understand how public procurement impacts budget execution in the Municipal GAD of the Canton Vinces, with a sample of 76 public servants belonging to GAD Vinces. Results were obtained that showed that expense control, process flexibility and transparency present a diversity of approaches that have public procurement as one of the elements that impact it. Concluding that the way in which Public Procurement is related to Budget Execution in the GAD of Vinces is HIGH, with 42.1% as the predominant level, Public Procurement, evidence that there is a prevailing need to strengthen the legal bases, planning relevant and transparent at all levels, while budget execution needs to have better control of spending, flexibility, and financial results that show adequate execution of the institutional budget. Finally, the results of the statistical analyzes show a correlation Rho = 0.930 between the public procurement variable and budget execution, being a high positive relationship.