Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.A
The budgetary control or follow-up includes an action plan, whose objective is to show that an expected goal is fulfilled that must be executed in a certain time and in conditions or clauses already established, it is carried out according to a constant evaluation at each stage; it is a very importa...
Guardat en:
| Autor principal: | |
|---|---|
| Format: | bachelorThesis |
| Idioma: | spa |
| Publicat: |
2019
|
| Matèries: | |
| Accés en línia: | http://dspace.utb.edu.ec/handle/49000/5627 |
| Etiquetes: |
Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
|
| _version_ | 1858410421276377088 |
|---|---|
| author | Escobar Torres, Karina Solange |
| author_facet | Escobar Torres, Karina Solange |
| author_role | author |
| collection | Repositorio Universidad Técnica de Babahoyo |
| dc.contributor.none.fl_str_mv | Acosta Roby, Martha Guadalupe |
| dc.creator.none.fl_str_mv | Escobar Torres, Karina Solange |
| dc.date.none.fl_str_mv | 2019-04-16T18:08:54Z 2019-04-16T18:08:54Z 2019 |
| dc.format.none.fl_str_mv | 34p application/pdf |
| dc.identifier.none.fl_str_mv | http://dspace.utb.edu.ec/handle/49000/5627 |
| dc.language.none.fl_str_mv | spa |
| dc.publisher.none.fl_str_mv | Babahoyo |
| dc.rights.none.fl_str_mv | info:eu-repo/semantics/openAccess |
| dc.source.none.fl_str_mv | reponame:Repositorio Universidad Técnica de Babahoyo instname:Universidad Técnica de Babahoyo instacron:UTB |
| dc.subject.none.fl_str_mv | PresupuestarioP CONSODET Contratos S.A |
| dc.title.none.fl_str_mv | Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.A |
| dc.type.none.fl_str_mv | info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/bachelorThesis |
| description | The budgetary control or follow-up includes an action plan, whose objective is to show that an expected goal is fulfilled that must be executed in a certain time and in conditions or clauses already established, it is carried out according to a constant evaluation at each stage; it is a very important and necessary tool to evaluate the process to be executed during the life of a contract or activity that one wishes to fulfill; demonstrating that the programmed is within the tolerance range, evidencing a work of quality and respect. During the realization of this case study called "Budgetary control of civil works contracts awarded to the company CONSODET SA", as a cross-cutting axis, a preliminary analysis was carried out using the exploratory research technique, under the research sub-line of the management of accounting information, applying methodological tools such as interviewing, observation and analysis of documentation on contracts concluded between Decentralized Autonomous Governments of Ecuador, the general public and the company in question |
| eu_rights_str_mv | openAccess |
| format | bachelorThesis |
| id | UTB_dbdf184445de0f080df889ab9fb6bd0a |
| instacron_str | UTB |
| institution | UTB |
| instname_str | Universidad Técnica de Babahoyo |
| language | spa |
| network_acronym_str | UTB |
| network_name_str | Repositorio Universidad Técnica de Babahoyo |
| oai_identifier_str | oai:dspace.utb.edu.ec:49000/5627 |
| publishDate | 2019 |
| publisher.none.fl_str_mv | Babahoyo |
| reponame_str | Repositorio Universidad Técnica de Babahoyo |
| repository.mail.fl_str_mv | . |
| repository.name.fl_str_mv | Repositorio Universidad Técnica de Babahoyo - Universidad Técnica de Babahoyo |
| repository_id_str | 0 |
| spelling | Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.AEscobar Torres, Karina SolangePresupuestarioPCONSODETContratosS.AThe budgetary control or follow-up includes an action plan, whose objective is to show that an expected goal is fulfilled that must be executed in a certain time and in conditions or clauses already established, it is carried out according to a constant evaluation at each stage; it is a very important and necessary tool to evaluate the process to be executed during the life of a contract or activity that one wishes to fulfill; demonstrating that the programmed is within the tolerance range, evidencing a work of quality and respect. During the realization of this case study called "Budgetary control of civil works contracts awarded to the company CONSODET SA", as a cross-cutting axis, a preliminary analysis was carried out using the exploratory research technique, under the research sub-line of the management of accounting information, applying methodological tools such as interviewing, observation and analysis of documentation on contracts concluded between Decentralized Autonomous Governments of Ecuador, the general public and the company in questionEl control o seguimiento presupuestario comprende un plan de acción, cuyo objetivo es evidenciar que se cumpla una meta prevista que deberá ejecutarse en determinado tiempo y en condiciones o cláusulas ya establecidas, se realiza de acuerdo a una evaluación constante a cada etapa; es una herramienta muy importante y necesaria para evaluar el proceso a ejecutarse durante la vida de un contrato o actividad que se desea cumplir; demostrando que lo programado se encuentre dentro del rango de tolerancia, evidenciando un trabajo de calidad y respeto. Durante la realización de este caso de estudio denominado “Control presupuestario de los contratos de obras civiles adjudicados a la empresa CONSODET S.A.”, como eje transversal se realizó un análisis preliminar mediante la técnica de investigación exploratoria, bajo la sublínea de investigación de la gestión de la información contable, aplicando herramientas metodológicas como la entrevista, observación y análisis de documentación sobre los contratos celebrados entre Gobiernos Autónomos Descentralizados del Ecuador, público en general y la empresa en mención.BabahoyoAcosta Roby, Martha Guadalupe2019-04-16T18:08:54Z2019-04-16T18:08:54Z2019info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis34papplication/pdfhttp://dspace.utb.edu.ec/handle/49000/5627spainfo:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Babahoyoinstname:Universidad Técnica de Babahoyoinstacron:UTB2019-04-17T08:00:21Zoai:dspace.utb.edu.ec:49000/5627Institucionalhttp://dspace.utb.edu.ec/Universidad públicahttps://utb.edu.ec/http://dspace.utb.edu.ec/oai.Ecuador...opendoar:02026-02-28T22:24:22.951077Repositorio Universidad Técnica de Babahoyo - Universidad Técnica de Babahoyotrue |
| spellingShingle | Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.A Escobar Torres, Karina Solange PresupuestarioP CONSODET Contratos S.A |
| status_str | publishedVersion |
| title | Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.A |
| title_full | Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.A |
| title_fullStr | Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.A |
| title_full_unstemmed | Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.A |
| title_short | Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.A |
| title_sort | Control presupuestario de los contratos de obras civiles adjudicados a la Empresa CONSODET S.A |
| topic | PresupuestarioP CONSODET Contratos S.A |
| url | http://dspace.utb.edu.ec/handle/49000/5627 |