Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020

This case study arises from the problem that is observed in the administration of costs and the budget of the different works during the 2020 period of Constructora Chalett SA, the following analysis has been carried out using the information provided by the company and has The objective is to analy...

पूर्ण विवरण

में बचाया:
ग्रंथसूची विवरण
मुख्य लेखक: Zumba León, Angie Juleidy (author)
स्वरूप: bachelorThesis
प्रकाशित: 2021
विषय:
ऑनलाइन पहुंच:http://dspace.utb.edu.ec/handle/49000/10741
टैग: टैग जोड़ें
कोई टैग नहीं, इस रिकॉर्ड को टैग करने वाले पहले व्यक्ति बनें!
_version_ 1863483727838969856
author Zumba León, Angie Juleidy
author_facet Zumba León, Angie Juleidy
author_role author
collection Repositorio Universidad Técnica de Babahoyo
dc.contributor.none.fl_str_mv Vanegas Rodríguez, Vicente Valentino
dc.creator.none.fl_str_mv Zumba León, Angie Juleidy
dc.date.none.fl_str_mv 2021-11-25T18:02:36Z
2021-11-25T18:02:36Z
2021
dc.format.none.fl_str_mv 21 p.
application/pdf
dc.identifier.none.fl_str_mv http://dspace.utb.edu.ec/handle/49000/10741
dc.language.none.fl_str_mv es
dc.publisher.none.fl_str_mv BABAHOYO: UTB, 2021
dc.rights.none.fl_str_mv Atribución-NoComercial-SinDerivadas 3.0 Ecuador
http://creativecommons.org/licenses/by-nc-nd/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica de Babahoyo
instname:Universidad Técnica de Babahoyo
instacron:UTB
dc.subject.none.fl_str_mv Presupuestos
Costos
Obra
Construcción
dc.title.none.fl_str_mv Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description This case study arises from the problem that is observed in the administration of costs and the budget of the different works during the 2020 period of Constructora Chalett SA, the following analysis has been carried out using the information provided by the company and has The objective is to analyze the budget items versus the actual costs, in order to determine which cost elements are involved at the time of preparing the budget for each work and therefore to know the activities carried out in its execution. The optics of the research is qualitative and quantitative since its purpose is to carry out an analysis of the budget items, in order to meet the objective the analytical method was used and the inductive and deductive method was used to generate the conclusions. The results of the investigation show variations in two elements of the estimated costs versus the real costs of the construction company, however, the executed costs are presented with lower results than those budgeted, due to these differences it can be determined that the company presents a deficient budgetary control, which is due to the lack of training of the personnel in charge of preparing the budget and of the delegates for its execution.
eu_rights_str_mv openAccess
format bachelorThesis
id UTB_f31cea4909813d79e76715c4c8feb832
instacron_str UTB
institution UTB
instname_str Universidad Técnica de Babahoyo
language_invalid_str_mv es
network_acronym_str UTB
network_name_str Repositorio Universidad Técnica de Babahoyo
oai_identifier_str oai:dspace.utb.edu.ec:49000/10741
publishDate 2021
publisher.none.fl_str_mv BABAHOYO: UTB, 2021
reponame_str Repositorio Universidad Técnica de Babahoyo
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica de Babahoyo - Universidad Técnica de Babahoyo
repository_id_str 0
rights_invalid_str_mv Atribución-NoComercial-SinDerivadas 3.0 Ecuador
http://creativecommons.org/licenses/by-nc-nd/3.0/ec/
spelling Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020Zumba León, Angie JuleidyPresupuestosCostosObraConstrucciónThis case study arises from the problem that is observed in the administration of costs and the budget of the different works during the 2020 period of Constructora Chalett SA, the following analysis has been carried out using the information provided by the company and has The objective is to analyze the budget items versus the actual costs, in order to determine which cost elements are involved at the time of preparing the budget for each work and therefore to know the activities carried out in its execution. The optics of the research is qualitative and quantitative since its purpose is to carry out an analysis of the budget items, in order to meet the objective the analytical method was used and the inductive and deductive method was used to generate the conclusions. The results of the investigation show variations in two elements of the estimated costs versus the real costs of the construction company, however, the executed costs are presented with lower results than those budgeted, due to these differences it can be determined that the company presents a deficient budgetary control, which is due to the lack of training of the personnel in charge of preparing the budget and of the delegates for its execution.This case study arises from the problem that is observed in the administration of costs and the budget of the different works during the 2020 period of Constructora Chalett SA, the following analysis has been carried out using the information provided by the company and has The objective is to analyze the budget items versus the actual costs, in order to determine which cost elements are involved at the time of preparing the budget for each work and therefore to know the activities carried out in its execution. The optics of the research is qualitative and quantitative since its purpose is to carry out an analysis of the budget items, in order to meet the objective the analytical method was used and the inductive and deductive method was used to generate the conclusions. The results of the investigation show variations in two elements of the estimated costs versus the real costs of the construction company, however, the executed costs are presented with lower results than those budgeted, due to these differences it can be determined that the company presents a deficient budgetary control, which is due to the lack of training of the personnel in charge of preparing the budget and of the delegates for its execution.El presente estudio de caso nace de la problemática que se observa en la administración de los costos y el presupuesto de las diferentes obras durante el periodo 2020 de la Constructora Chalett S.A., el siguiente análisis se ha realizado mediante la información proporcionada por la empresa y tiene como objetivo el analizar las partidas presupuestarias versus los costos reales, para poder determinar cuáles son los elementos del costo que se encuentran involucrados al momento de elaborar el presupuesto para cada obra y por ende conocer las actividades que realizan en ejecución de la misma. La óptica de la investigación es de carácter cualitativo y cuantitativo ya que su propósito es realizar un análisis de las partidas presupuestarias, para poder cumplir con el objetivo se empleó el método analítico y para generar las conclusiones se utilizó el método inductivo y deductivo. Los resultados de la investigación muestran variaciones en dos elementos de los costos estimados versus los costos reales de la constructora, sin embargo, los costos ejecutados se presentan con resultados inferiores a los presupuestados, debido a estas diferencias se puede determinar que la empresa presenta un deficiente control presupuestario, lo cual se debe por la falta de capacitación al personal encargado en la elaboración del presupuesto y en los delegados de la ejecución del mismo.BABAHOYO: UTB, 2021Vanegas Rodríguez, Vicente Valentino2021-11-25T18:02:36Z2021-11-25T18:02:36Z2021info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis21 p.application/pdfhttp://dspace.utb.edu.ec/handle/49000/10741esAtribución-NoComercial-SinDerivadas 3.0 Ecuadorhttp://creativecommons.org/licenses/by-nc-nd/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Babahoyoinstname:Universidad Técnica de Babahoyoinstacron:UTB2022-02-08T08:36:54Zoai:dspace.utb.edu.ec:49000/10741Institucionalhttp://dspace.utb.edu.ec/Universidad públicahttps://utb.edu.ec/http://dspace.utb.edu.ec/oai.Ecuador...opendoar:02026-04-25T22:21:32.418371Repositorio Universidad Técnica de Babahoyo - Universidad Técnica de Babahoyotrue
spellingShingle Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020
Zumba León, Angie Juleidy
Presupuestos
Costos
Obra
Construcción
status_str publishedVersion
title Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020
title_full Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020
title_fullStr Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020
title_full_unstemmed Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020
title_short Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020
title_sort Presupuestos vs costos reales de la Constructora Chalett S.A en el año 2020
topic Presupuestos
Costos
Obra
Construcción
url http://dspace.utb.edu.ec/handle/49000/10741