Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.

The purpose of this research is to evaluate the productivity in the extrusion area of the “Corporación Ecuatoriana de Aluminio CEDAL S.A.”, in order to increase the productivity of the aluminium extrusion process, eliminating the bottlenecks that are used during profiling fabrication, through times...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Autor principal: Paredes Almeida, Edison Leonardo (author)
Outros Autores: Santander Fonseca, Daniel Santiago (author)
Formato: bachelorThesis
Idioma:spa
Publicado em: 2019
Assuntos:
Acesso em linha:http://repositorio.utc.edu.ec/handle/27000/5474
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
_version_ 1822282027849744384
author Paredes Almeida, Edison Leonardo
author2 Santander Fonseca, Daniel Santiago
author2_role author
author_facet Paredes Almeida, Edison Leonardo
Santander Fonseca, Daniel Santiago
author_role author
collection Repositorio Universidad Técnica de Cotopaxi
dc.contributor.none.fl_str_mv Navas, Hernán
dc.creator.none.fl_str_mv Paredes Almeida, Edison Leonardo
Santander Fonseca, Daniel Santiago
dc.date.none.fl_str_mv 2019-02
2020-07-24T20:55:49Z
2020-07-24T20:55:49Z
dc.format.none.fl_str_mv 63 páginas
dc.identifier.none.fl_str_mv Paredes Almeida.E.L. (2019) Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A. UTC. Latacunga. 63 P.
http://repositorio.utc.edu.ec/handle/27000/5474
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Ecuador: Latacunga: Universidad Técnica de Cotopaxi: Facultad de Ciencias de la Ingeniería y Aplicadas
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica de Cotopaxi
instname:Universidad Técnica de Cotopaxi
instacron:UTC
dc.subject.none.fl_str_mv Ingeniería Industrial
Extrusión de aluminio
Productividad
Tiempos y movimientos
dc.title.none.fl_str_mv Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description The purpose of this research is to evaluate the productivity in the extrusion area of the “Corporación Ecuatoriana de Aluminio CEDAL S.A.”, in order to increase the productivity of the aluminium extrusion process, eliminating the bottlenecks that are used during profiling fabrication, through times and movements study. In the research the activities of the different jobs that form the extrusion process of profiles and the productive system were examine, by means of the survey of the real productivity information, later to propose an improvement proposal. In order to gather information from the proposed study, a field modality was adopted, using tools such as direct timing, documental revision and using the "promodel" software to evaluate the production system of the extrusion area. The obtained results allowed identifying the existing problem in an activity, which does not contribute in the fulfilment of the proposed productivity due to the fact that they present high times and a low utilization having a maximum yield in productivity of 800 to 910k / h. Next, a proposal is projected by means of a calculation that allows determining the ideal billet length for the matrices of high rotation present in the ABC of the year 2018. It is concluded that in the process there are bottlenecks due to a reduced use of the facilities generating aluminium waste, and therefore reducing the productivity required by the company. The use of a new work method, allows optimizing resources such as, raw material and machinery, giving an increase of the activities for the fulfilment of the proposed goals and the obtaining of quality products that satisfy the needs and requirements of the client.
eu_rights_str_mv openAccess
format bachelorThesis
id UTC_024b4a3bb8dae02502164e7832e5d47f
identifier_str_mv Paredes Almeida.E.L. (2019) Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A. UTC. Latacunga. 63 P.
instacron_str UTC
institution UTC
instname_str Universidad Técnica de Cotopaxi
language spa
network_acronym_str UTC
network_name_str Repositorio Universidad Técnica de Cotopaxi
oai_identifier_str oai:oai:repositorio.utc.edu.ec:27000:27000/5474
publishDate 2019
publisher.none.fl_str_mv Ecuador: Latacunga: Universidad Técnica de Cotopaxi: Facultad de Ciencias de la Ingeniería y Aplicadas
reponame_str Repositorio Universidad Técnica de Cotopaxi
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.Paredes Almeida, Edison LeonardoSantander Fonseca, Daniel SantiagoIngeniería IndustrialExtrusión de aluminioProductividadTiempos y movimientosThe purpose of this research is to evaluate the productivity in the extrusion area of the “Corporación Ecuatoriana de Aluminio CEDAL S.A.”, in order to increase the productivity of the aluminium extrusion process, eliminating the bottlenecks that are used during profiling fabrication, through times and movements study. In the research the activities of the different jobs that form the extrusion process of profiles and the productive system were examine, by means of the survey of the real productivity information, later to propose an improvement proposal. In order to gather information from the proposed study, a field modality was adopted, using tools such as direct timing, documental revision and using the "promodel" software to evaluate the production system of the extrusion area. The obtained results allowed identifying the existing problem in an activity, which does not contribute in the fulfilment of the proposed productivity due to the fact that they present high times and a low utilization having a maximum yield in productivity of 800 to 910k / h. Next, a proposal is projected by means of a calculation that allows determining the ideal billet length for the matrices of high rotation present in the ABC of the year 2018. It is concluded that in the process there are bottlenecks due to a reduced use of the facilities generating aluminium waste, and therefore reducing the productivity required by the company. The use of a new work method, allows optimizing resources such as, raw material and machinery, giving an increase of the activities for the fulfilment of the proposed goals and the obtaining of quality products that satisfy the needs and requirements of the client.El presente estudio tiene como propósito de evaluación la productividad en el área de extrusión de la Corporación ecuatoriana de aluminio CEDAL S.A., para aumentar la productividad en el proceso de extrusión de aluminio, eliminar cuellos de botella que se presentan durante el transcurso de fabricación de perfiles, a través de un estudio de tiempos y movimientos. En la investigación se examinó en cada una de las actividades de los diferentes puestos de trabajo que conforman el proceso de extruido de perfiles y el sistema productivo, mediante el levantamiento de información de la productividad actual, para posteriormente plantear una propuesta de mejora. Para el levantamiento de información del estudio propuesto se adopta una modalidad de campo, empleando herramientas como la toma de tiempos directa, revisión documental y haciendo uso del software “promodel” para evaluar el sistema productivo del área de extrusión. Los resultados obtenidos permitieron identificar el problema existente en una actividad, misma que no aporta en el cumplimiento de la productividad propuesta debido a que presentan tiempos altos y una baja utilización teniendo un rendimiento máximo en productividad de 800 a 910k/h. A continuación, se plantea una propuesta mediante un cálculo que permita determinar el largo de tocho ideal para las matrices de alta rotación presentes en el ABC del año 2018. Se concluye que en el proceso existen cuellos de botella a causa de un reducido aprovechamiento de las instalaciones generando desperdicios de aluminio y reduciendo por tal motivo la productividad requerida por la empresa. El uso de un nuevo método de trabajo, permite optimizar recursos siendo estos la materia prima y maquinaria, dando el cumplimiento de las metas propuestas y la obtención de productos de calidad que satisfagan las necesidades y requerimientos del clienteEcuador: Latacunga: Universidad Técnica de Cotopaxi: Facultad de Ciencias de la Ingeniería y AplicadasNavas, Hernán2020-07-24T20:55:49Z2020-07-24T20:55:49Z2019-02info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis63 páginasParedes Almeida.E.L. (2019) Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A. UTC. Latacunga. 63 P.http://repositorio.utc.edu.ec/handle/27000/5474spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2020-07-25T08:00:48Zoai:oai:repositorio.utc.edu.ec:27000:27000/5474Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02025-01-26T03:44:13.214205Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue
spellingShingle Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.
Paredes Almeida, Edison Leonardo
Ingeniería Industrial
Extrusión de aluminio
Productividad
Tiempos y movimientos
status_str publishedVersion
title Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.
title_full Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.
title_fullStr Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.
title_full_unstemmed Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.
title_short Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.
title_sort Estudio de tiempos y movimientos en el área de extrusión en la empresa CEDAL S.A.
topic Ingeniería Industrial
Extrusión de aluminio
Productividad
Tiempos y movimientos
url http://repositorio.utc.edu.ec/handle/27000/5474