Elaboración de un plan de mantenimiento preventivo para el tren de laminación de productos pequeños (LPP) de la empresa NOVACERO S.A. Planta Lasso.
In NOVACERO S.A Company Lasso plant, currently it consists of two lines to manufacture profiles. “El Tren dos” which previously produced all the hot rolled profiles manufactured in its Lasso plant and el tren LPP (Laminate of small products), which replaced it in 2012 in the production of short prof...
Saved in:
| Main Author: | Muso Tibán, Cristian Fabricio (author) |
|---|---|
| Other Authors: | Otavalo Puco, Anthony Efraín (author) |
| Format: | bachelorThesis |
| Language: | spa |
| Published: |
2018
|
| Subjects: | |
| Online Access: | http://repositorio.utc.edu.ec/handle/27000/5561 |
| Tags: |
No Tags, Be the first to tag this record!
|
Similar Items
-
Elaboración de un plan de mantenimiento preventivo para el tren de laminación de productos pequeños (LPP) de la empresa NOVACERO S.A. Planta Lasso.
by: Muso Tibán, Cristian Fabricio
Published: (2018) -
Control estadístico del proceso de fabricación de perfiles en la Empresa Novacero planta Lasso
by: Changoluisa Camacho, María Cristina
Published: (2014) -
Articulo - Científico. Control estadístico del proceso de fabricación de perfiles en la Empresa Novacero planta Lasso
by: Changoluisa Camacho, María Cristina
Published: (2014) -
Mejoramiento del proceso de fabricación de perfiles laminados en el lpp de la Empresa Novacero planta Lasso
by: Changoluisa Camacho, María Cristina
Published: (2014) -
Diseño e implementación de una estación para el empaquetado y despacho automático de una tonelada de varillas para el tren uno de laminación de la empresa NOVACERO S.A.
by: Benalcázar Cabezas, David Alejandro
Published: (2014)