Elaboración de un plan de mantenimiento preventivo para el tren de laminación de productos pequeños (LPP) de la empresa NOVACERO S.A. Planta Lasso.
In NOVACERO S.A Company Lasso plant, currently it consists of two lines to manufacture profiles. “El Tren dos” which previously produced all the hot rolled profiles manufactured in its Lasso plant and el tren LPP (Laminate of small products), which replaced it in 2012 in the production of short prof...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | bachelorThesis |
| Language: | spa |
| Published: |
2018
|
| Subjects: | |
| Online Access: | http://repositorio.utc.edu.ec/handle/27000/5561 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!