Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica.
This paper evaluates the energy potential of the pipeline for water supply Chiquihurco Dam - Apatug Treatment Plant in the province of Tungurahua, this study is based on the theoretical foundation and hydrological, topographical and geotechnical studies developed in the area. In this study the desig...
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| التنسيق: | masterThesis |
| اللغة: | spa |
| منشور في: |
2015
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://repositorio.utc.edu.ec/handle/27000/6546 |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
| _version_ | 1858430343147683840 |
|---|---|
| author | Arteaga López, Oscar Bladimir |
| author_facet | Arteaga López, Oscar Bladimir |
| author_role | author |
| collection | Repositorio Universidad Técnica de Cotopaxi |
| dc.contributor.none.fl_str_mv | Rodríguez Bárcenas, Gustavo, PhD. |
| dc.creator.none.fl_str_mv | Arteaga López, Oscar Bladimir |
| dc.date.none.fl_str_mv | 2015-04 2020-10-19T02:31:32Z 2020-10-19T02:31:32Z |
| dc.format.none.fl_str_mv | 120 páginas application/pdf |
| dc.identifier.none.fl_str_mv | Arteaga López. O.B. (2015) Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. U.T.C. Latacunga. 120 p. MUTC-000268 http://repositorio.utc.edu.ec/handle/27000/6546 |
| dc.language.none.fl_str_mv | spa |
| dc.publisher.none.fl_str_mv | Ecuador: Latacunga: Universidad Técnica de Cotopaxi; Dirección de Posgrados |
| dc.rights.none.fl_str_mv | closedAccess http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ info:eu-repo/semantics/openAccess |
| dc.source.none.fl_str_mv | reponame:Repositorio Universidad Técnica de Cotopaxi instname:Universidad Técnica de Cotopaxi instacron:UTC |
| dc.subject.none.fl_str_mv | Gestión de energías Potencial energético Central hidroeléctrica Estudios hidrológicos |
| dc.title.none.fl_str_mv | Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. |
| dc.type.none.fl_str_mv | info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/masterThesis |
| description | This paper evaluates the energy potential of the pipeline for water supply Chiquihurco Dam - Apatug Treatment Plant in the province of Tungurahua, this study is based on the theoretical foundation and hydrological, topographical and geotechnical studies developed in the area. In this study the design of a small hydroelectric plant is proposed, which shows the advantages of: harnessing the raw water flow provided to Empresa Pública – Empresa Municipal de Agua Potable y Alcantarillado de Ambato (EP-EMAPA-A), using the particular topographic and soil conditions where the pipeline that transports such water to the treatment plant cuts across, and ensuring the maximum possible power generation and continuity in the by-gravity water supply to the treatment plant, even in situations where it is necessary to stop the operation of the turbine for maintenance or contingencies. The profitability of the proposed alternative is determined by the results analysis. The plant designed is capable of generating 1,08 MW with an acceptable investment of $ 1 927 650.79 and little environmental impact as several of the works developed for the Chiquihurco High Zone in Ambato water supply system can be used and with less environmental impact than that produced by other sources of electricity generation such as oil, solar and wind. |
| eu_rights_str_mv | openAccess |
| format | masterThesis |
| id | UTC_2e1da1bb0ae457fa347c6f82c8bb4204 |
| identifier_str_mv | Arteaga López. O.B. (2015) Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. U.T.C. Latacunga. 120 p. MUTC-000268 |
| instacron_str | UTC |
| institution | UTC |
| instname_str | Universidad Técnica de Cotopaxi |
| language | spa |
| network_acronym_str | UTC |
| network_name_str | Repositorio Universidad Técnica de Cotopaxi |
| oai_identifier_str | oai:repositorio.utc.edu.ec:27000/6546 |
| publishDate | 2015 |
| publisher.none.fl_str_mv | Ecuador: Latacunga: Universidad Técnica de Cotopaxi; Dirección de Posgrados |
| reponame_str | Repositorio Universidad Técnica de Cotopaxi |
| repository.mail.fl_str_mv | . |
| repository.name.fl_str_mv | Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi |
| repository_id_str | 0 |
| rights_invalid_str_mv | closedAccess http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ |
| spelling | Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica.Arteaga López, Oscar BladimirGestión de energíasPotencial energéticoCentral hidroeléctricaEstudios hidrológicosThis paper evaluates the energy potential of the pipeline for water supply Chiquihurco Dam - Apatug Treatment Plant in the province of Tungurahua, this study is based on the theoretical foundation and hydrological, topographical and geotechnical studies developed in the area. In this study the design of a small hydroelectric plant is proposed, which shows the advantages of: harnessing the raw water flow provided to Empresa Pública – Empresa Municipal de Agua Potable y Alcantarillado de Ambato (EP-EMAPA-A), using the particular topographic and soil conditions where the pipeline that transports such water to the treatment plant cuts across, and ensuring the maximum possible power generation and continuity in the by-gravity water supply to the treatment plant, even in situations where it is necessary to stop the operation of the turbine for maintenance or contingencies. The profitability of the proposed alternative is determined by the results analysis. The plant designed is capable of generating 1,08 MW with an acceptable investment of $ 1 927 650.79 and little environmental impact as several of the works developed for the Chiquihurco High Zone in Ambato water supply system can be used and with less environmental impact than that produced by other sources of electricity generation such as oil, solar and wind.En la presente investigación se evalúa el potencial energético de la línea de conducción para agua potable Presa Chiquihurco – Planta de Tratamiento Apatug en la Provincia de Tungurahua, en base a la fundamentación teórica y los estudios hidrológicos, topográficos y geotécnicos desarrollados en el área de estudio. En la propuesta se diseña una pequeña central hidroeléctrica que además de aprovechar el caudal de agua cruda concedida a la Empresa Pública – Empresa Municipal de Agua Potable y Alcantarillado de Ambato (EP-EMAPA-A) y las particulares condiciones topográficas del terreno por donde cruza la línea de conducción que traslada dicha agua hacia la planta de tratamiento, garantiza la máxima generación posible de energía y la continuidad en el suministro de agua por gravedad hacia la planta de tratamiento, aún en situaciones en las que sea necesario detener el funcionamiento de la turbina por mantenimientos o por imprevistos. Del análisis de resultados se determinó que la alternativa propuesta es técnica y económicamente factible debido a que es capaz de generar 1,08 MW con una inversión aceptable de 1 927 650,79 USD gracias a que utiliza varias de las obras desarrolladas para el proyecto Sistema de Agua Potable Chiquihurco Zona Alta de Ambato y con menos impacto ambiental que la producida por otras fuentes de generación eléctrica como el petróleo, la solar y la eólica.Ecuador: Latacunga: Universidad Técnica de Cotopaxi; Dirección de PosgradosRodríguez Bárcenas, Gustavo, PhD.2020-10-19T02:31:32Z2020-10-19T02:31:32Z2015-04info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis120 páginasapplication/pdfArteaga López. O.B. (2015) Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. U.T.C. Latacunga. 120 p.MUTC-000268http://repositorio.utc.edu.ec/handle/27000/6546spaclosedAccesshttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2020-10-19T08:00:41Zoai:repositorio.utc.edu.ec:27000/6546Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02026-03-01T03:45:15.089819Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue |
| spellingShingle | Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. Arteaga López, Oscar Bladimir Gestión de energías Potencial energético Central hidroeléctrica Estudios hidrológicos |
| status_str | publishedVersion |
| title | Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. |
| title_full | Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. |
| title_fullStr | Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. |
| title_full_unstemmed | Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. |
| title_short | Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. |
| title_sort | Evaluación del potencial energético de la línea de conducción para agua potable Presa Chiquihurco - Planta de Tratamiento Apatug 2013. Diseño de un sistema para el aprovechamiento de la energía hidráulica. |
| topic | Gestión de energías Potencial energético Central hidroeléctrica Estudios hidrológicos |
| url | http://repositorio.utc.edu.ec/handle/27000/6546 |