Optimización de despacho para la gestión de una micro red aislada en el sector de Salache.
This research addresses the problem that the microgrid located on the Salache campus of the Technical University of Cotopaxi (UTC) does not have an optimization model, since the maximum power generated by the photovoltaic system is not used and it is not managed by a Adequate way, so that the cost o...
保存先:
| 第一著者: | |
|---|---|
| その他の著者: | |
| フォーマット: | masterThesis |
| 言語: | spa |
| 出版事項: |
2021
|
| 主題: | |
| オンライン・アクセス: | http://repositorio.utc.edu.ec/handle/27000/8011 |
| タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
| 要約: | This research addresses the problem that the microgrid located on the Salache campus of the Technical University of Cotopaxi (UTC) does not have an optimization model, since the maximum power generated by the photovoltaic system is not used and it is not managed by a Adequate way, so that the cost of electrical energy is as low as possible when it is required to connect to the conventional network, the objective is to analyze the optimization proposal to achieve optimal energy management in the micro-network through a mathematical model and a control algorithm. This study was carried out using the Matlab / Simulink simulation software, which allowed simulating the microgrid system and evaluating the performance of the MPPT control algorithm (maximum power point tracker), for this the photovoltaic panel was modeled, regulator of load and single-phase inverter. For the optimization, the Fico Xpress Optimizer program was used, which allowed solving the mathematical model proposed by linear programming to supply the electricity demand at a lower operating cost of the microgrid. As a result of the MPPT control algorithm, the maximum power is extracted from the solar panel to the battery charging system, under any environmental condition (solar radiation, partial shading or temperature). Finally, through the mathematical model, the generation of the photovoltaic system, the charging and discharging of the batteries and the electrical energy network were managed in an adequate way. Obtained the results for the proper configuration of the micro network. |
|---|